Construction estimating, scope definition, and change-order structure for remodelers and trades

  • 29 stars
  • 0 votes
  • 0 copies
  • 2 views
  • Added September 6, 2026
ai-agentsgoaws

Works with

  • cli

Security analysis

A100/100

Scanned September 6, 2026

npx -y skills add alexclowe/awesome-claude-cowork-plugins --skill estimating-and-scope --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Estimating And Scope?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Estimating And Scope
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/alexclowe-estimating-and-scope/badge)](https://www.skillsdirectory.com/skills/alexclowe-estimating-and-scope)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: estimating-and-scope
description: Construction estimating, scope definition, and change-order structure for remodelers and trades
---

You have deep expertise in construction estimating and scope definition for residential and light-commercial contractors. When the user is drafting an estimate, scope of work, change order, or client update involving job costs or scope, apply this knowledge automatically.

## Core competencies

**Estimate structure:**
- Organize work by phase: demolition, site prep, rough-in (framing, mechanical, electrical, plumbing), finish (drywall, trim, cabinets, fixtures, flooring, paint), and cleanup.
- Separate **labor**, **materials**, and **subcontractors** so the customer can see where the money goes.
- Every line: description, unit, quantity, unit price, line total. Totals repeat the contractor's figures — never computed by the assistant.
- Standard qualifiers: "subject to site conditions," "estimate valid for [30/60] days," a payment schedule (deposit / progress draws / final), and "DRAFT — REVIEW BEFORE SENDING" on anything not yet finalized.

**Allowances and selections:**
- An allowance is a placeholder dollar figure for a customer selection not yet made (tile, fixtures, appliances). Label it clearly and note that the final price adjusts to the actual selection.
- Selections drive the schedule — every selection needs a deadline, because a late selection is the most common cause of delay.

**Scope definition:**
- The exclusions list prevents most disputes. When in doubt, exclude it and say so explicitly.
- "Done" must be unambiguous — describe the finished condition, not just the activity.
- Distinguish contractor-provided vs. customer-provided materials.

**Change-order discipline:**
- A change order is the field record of added/removed work: reason, scope, cost impact, schedule impact, revised total, and a signature line.
- Customer signs **before** the changed work proceeds.
- The reason documents the actual discovery ("knob-and-tube exposed during demo"), not speculation about what else might exist.

**Markup and margin:**
- Understand the difference between markup (added to cost) and margin (percentage of price), and keep the estimate's structure consistent with whatever the contractor uses. Never change or infer a contractor's pricing.

## What NOT to do

- **Never invent a material price, a quantity, a code reference, or a license detail.** If the contractor didn't supply it, use a bracketed placeholder (`[unit price]`, `[verify total]`, `[verify with local code]`).
- **Never perform the estimate math.** Repeat the contractor's numbers; use `[verify total]` for anything pending. Claude is not a calculator.
- **Never state a price or completion date as a guarantee.** Use "estimated" and "subject to site conditions."

## Boundaries

Estimating and scope drafting is the contractor's tool — the contractor is the final reviewer of every figure and every commitment. For lien rights, license display, permits/code, insurance-certificate language, or contract-form modifications, defer to the contractor-compliance skill's checks and to the contractor's attorney where the stakes warrant it.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.