Skip to content
Back to skills

Vllm Nvidia Hardware

ASecurity

NVIDIA AI-hardware + vLLM-platform reference covering Hopper (H100/H200), Blackwell (B100/B200/B300) and Blackwell Ultra, Grace-Blackwell superchips and NVL72 racks (GB200, GB300), Vera Rubin (R100/R300) with VR200 NVL144 and Kyber NVL576, Dell PowerEdge XE family and IR5000/IR7000/IR9048 racks. Per-SKU HBM, FP4/FP8/FP16 TFLOPs, NVLink5, TDP, rack power/cooling (135 kW GB300, 180-220 kW NVL144, 600 kW Kyber), DLC vs RDHx, 800 VDC HVDC. Memory-wall roofline, HBM3E→HBM4 supply 2026. vLLM attent...

  • 5 stars
  • 0 votes
  • 0 copies
  • 1 view
  • Added May 27, 2026
data-aigonodebackend

Security analysis

A100/100

Pro scans all 10 files and shows the line behind each finding

Scanned May 27, 2026

npx -y skills add air-gapped/skills --skill vllm-nvidia-hardware --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Vllm Nvidia Hardware?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Vllm Nvidia Hardware
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/air-gapped-vllm-nvidia-hardware/badge)](https://www.skillsdirectory.com/skills/air-gapped-vllm-nvidia-hardware)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: vllm-nvidia-hardware
description: |-
  NVIDIA AI-hardware + vLLM-platform reference covering Hopper (H100/H200), Blackwell (B100/B200/B300) and Blackwell Ultra, Grace-Blackwell superchips and NVL72 racks (GB200, GB300), Vera Rubin (R100/R300) with VR200 NVL144 and Kyber NVL576, Dell PowerEdge XE family and IR5000/IR7000/IR9048 racks. Per-SKU HBM, FP4/FP8/FP16 TFLOPs, NVLink5, TDP, rack power/cooling (135 kW GB300, 180-220 kW NVL144, 600 kW Kyber), DLC vs RDHx, 800 VDC HVDC. Memory-wall roofline, HBM3E→HBM4 supply 2026. vLLM attention-backend × SM matrix, FP4/FP8 paths, KV connectors, Blackwell gotchas (SM103 TRTLLM hang, 270 vs 288 GB B300 bin split).
when_to_use: |-
  Trigger on NVIDIA-AI hardware sizing, procurement, facility, or vLLM-deployment questions. Triggers — HBM capacity/bandwidth, TDP, NVLink, GB300 NVL72 power/cooling, Vera Rubin timing, Dell PowerEdge XE, IR7000 racks, ORv3 power shelves, DLC flow rate, warm-water 45 °C, 800 VDC HVDC, rack weight, floor load, HBM supply 2026, FlashAttention/FlashInfer/FlashMLA/CUTLASS MLA/TRTLLM per SM, NVFP4, MXFP4, NixlConnector, MooncakeConnector, LMCache, CUDA 13 arch list, SM100/SM103/SM120 gotchas, memory-wall roofline, prefill-vs-decode. Narrow phrasings — "HBM on our XE9780", "wait for Rubin", "which GPU for {model}", "B200 vs H200 choice". Also implicit — "sizing for {model}", "audit hardware", "rack power budget", "can this GPU run {model}", "GPU recommendation", "deploy-memo hardware", "spec-study hardware".
---

# vLLM on NVIDIA hardware — Hopper through Rubin

Target audience: operators who run vLLM on NVIDIA datacenter GPUs, sizing from single H100 nodes up to GB300 NVL72 racks, and evaluating Vera Rubin for 2026–2027 purchases.

This skill is a **reference**, not a walkthrough — most of the content is SKU tables, facility prerequisites, and platform compatibility matrices. The SKILL.md body holds the quick-answer shortcuts; the `references/` directory has the full tables. Read the reference file that matches the question.

## The one thing to know before anything else

LLM inference has two phases with radically different bottlenecks:

- **Prefill** is compute-bound (GEMMs, AI ≫ ridge point) — more FLOPs help.
- **Decode** is memory-bandwidth-bound (AI ≈ 1, 100× below the ridge) — more HBM bandwidth helps, more FLOPs don't.

Every hardware decision — FP4 vs FP8, B300's higher FLOPs with the same 8 TB/s, NVL72's domain collapse, Rubin's HBM4 jump to ~20 TB/s — is about relieving the memory wall on decode while keeping prefill healthy. Read `references/fundamentals.md` for the roofline math and the HBM roadmap context that makes the rest of the tables meaningful.

## Quick-answer router

**Hardware specs** ("what's the HBM on X?", "TDP of Y?")
- NVIDIA GPU SKUs (Hopper, Blackwell, Blackwell Ultra) → `references/gpu-specs.md`
- Vera Rubin roadmap (R100, Rubin Ultra, NVL144, Kyber NVL576) → `references/rubin-roadmap.md`
- Dell PowerEdge XE servers → `references/dell-xe.md`
- GB300 NVL72 vendor landscape + facility prereqs → `references/nvl72-procurement.md`

**Memory-wall reasoning** ("why does FP4 help?", "why NVL72?")
- Fundamentals (roofline, BW/FLOPs gap, HBM roadmap, supply, energy) → `references/fundamentals.md`
- Mitigations × platform matrix (what works on Hopper vs Blackwell) → `references/mitigations.md`

**vLLM on NVIDIA** ("what backend on SM100?", "FlashMLA on Blackwell?")
- Attention backend × SM matrix, quant, KV connectors, known gotchas, release-note highlights → `references/vllm-platform-matrix.md`
- GEMM backends (DeepGEMM vs CUTLASS, FP8 alignment, E8M0 scaling, JIT cache) → `references/gemm-backends.md`

## The five most common operator mistakes this skill exists to prevent

1. **Conflating the two B300 bins.** NVIDIA ships B300 in two bins: **DGX / GB300 Superchip = 288 GB HBM3E / 1,400 W**, and **HGX B300 NVL8 SXM6 (OEM baseboards) = 270 GB / 1,100 W**. Dell PowerEdge XE9780/XE9780L/XE9780LAP/XE9785/XE9785L all carry the **HGX NVL8 bin** (270 GB / 1,100 W). Getting this wrong puts the 8-GPU TDP budget off by 2.4 kW and the per-GPU HBM off by 18 GB. `references/gpu-specs.md` §2.2 has both rows.

2. **Assuming B300 is HBM4.** It isn't. B300 uses HBM3E (12-Hi stacks, 288 GB at the top bin). HBM4 first ships in **Vera Rubin R100** (H2 2026) with ~20 TB/s per GPU. This matters for roadmap planning.

3. **Assuming GB300 NVL72 can use rear-door heat exchangers.** It can't — at 135 kW nominal / 155 kW peak per rack, direct liquid cooling is mandatory on GPUs + CPUs + NVSwitch + CX-8 NICs. Facility work (row-level CDU, 3φ 480V feeds, 1500 kg/m² floor) routinely takes 6–9 months. See `references/nvl72-procurement.md`.

4. **Confusing Dell's "XE9780 (air)" with "XE9780L (liquid)".** They are separate SKUs in the same spec sheet. Also note that **XE9680L in Dell's 2026 portfolio is a 4U B200 liquid-cooled node**, not a liquid-cooled variant of the 6U XE9680 H100/H200 chassis. `references/dell-xe.md` has the name disambiguation.

5. **Running TRTLLM attention on GB300 with bare FlashInfer 0.6.7.** SM103 (GB300) **hung** with FlashInfer 0.6.7 (regression vs 0.6.6) — **fixed 2026-04-07** via flashinfer-ai/flashinfer#2956 (closes #2939) in 0.6.7.postN. If pinned to plain 0.6.7 without the post fix, disable TRTLLM on SM103 (the FlashInfer default backend is actually faster there). `references/vllm-platform-matrix.md` has this and other Blackwell readiness notes.

## Operator cheat sheet

### Running vLLM on Hopper (H100/H200)
- Default to FP8 weights + FP8 KV cache on H200 for long context.
- Use FlashMLA for DeepSeek models; FlashAttention-3 elsewhere.
- Disagg prefill across nodes needs XDR IB + GPUDirect-RDMA — use CPU/NVMe offload (LMCache) first.
- **No FP4. No NVL72. No 288 GB single-GPU.**

### Running vLLM on Blackwell (B200/B300)
- Switch to FP4 (NVFP4 via ModelOpt checkpoints) — 1.8–2× decode throughput on the same HBM budget.
- NVL72 collapses disagg cost — keep prefill/decode inside one NVLink5 domain; use `NixlConnector`.
- Pin vLLM **≥ v0.19** for first-class B300/GB300 (SM 10.3) support.
- 270 GB (HGX bin) or 288 GB (DGX bin) HBM per B300 often removes the *need* for KV offload on 70B-scale models. LMCache still earns its keep for 1M+ context and heavy prefix reuse.

### Buying NVIDIA hardware in 2026
- **GB300 NVL72 is safe for 2026 capacity:** size the row for 135–155 kW, DLC @ 25 °C, 3φ 480 V. Vendors: NVIDIA DGX B300, Dell IR7000 + XE9780L / XE8712 sleds, Supermicro SRS-GB300-NVL72, Lenovo 7DJVCTO2WW, HPE.
- **Greenfield rows should be spec'd for Rubin NVL144:** 180–220 kW, 45 °C W45 warm water, 800 VDC HVDC, new MGX rack. Retrofitting later is expensive.
- **Expect HBM allocation and PSU rectifier shelf lead times to dominate schedule risk.** SK hynix / Micron / Samsung HBM sold out through CY26.

### Key numbers to memorize
| Metric | Value |
|---|---|
| GB300 NVL72 rack power | 135 kW nominal / 155 kW peak |
| GB300 NVL72 aggregate HBM | 20.7 TB HBM3E |
| GB300 NVL72 aggregate HBM BW | ~576 TB/s |
| GB300 NVL72 NVLink domain | 72 GPUs flat, 130 TB/s |
| B300 (HGX NVL8, Dell fleet) | 270 GB / 1,100 W |
| B300 (DGX / GB300 Superchip) | 288 GB / 1,400 W |
| H200 SXM5 | 141 GB HBM3E / 4.8 TB/s / 700 W |
| Rubin R100 (H2 2026) | ~288 GB HBM4 / ~20 TB/s |
| Rubin NVL144 rack power | 180–220 kW (800 VDC HVDC) |
| Rubin Ultra Kyber NVL576 rack | 600 kW |

## Paired reference

If this skill helps with *why* a hardware choice matters for KV-cache sizing, the companion skill `vllm-caching` covers *how* to configure tiered KV (`--kv-offloading-size`, LMCache, NixlConnector, MooncakeConnector). Both skills should trigger together on combined "we're buying GB300 and need to size LMCache" style questions.

## Source and refresh policy

All claims in the references are sourced inline — **prefer NVIDIA first-party datasheets, SemiAnalysis, Dell/Lenovo/Supermicro OEM datasheets**, then reputable news. When numbers disagree across sources, the references report the range with each citation. The full consolidated source list is in `references/sources.md`.

This skill was compiled from `MEMORY_WALL_DEEP.md` (late-2025/early-2026 research pass); refresh when new NVIDIA products launch or when HBM / rack-power / vLLM backend landscape shifts materially.

Files in this skill

  • SKILL.md8.2 KB
  • references/dell-xe.md4.7 KB
  • references/fundamentals.md5.5 KB
  • references/gemm-backends.md7.4 KB
  • references/gpu-specs.md5.9 KB
  • references/mitigations.md5.1 KB
  • references/nvl72-procurement.md7.7 KB
  • references/rubin-roadmap.md4.3 KB
  • references/sources.md11.1 KB
  • references/vllm-platform-matrix.md7.4 KB

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.