Maintenance planning and scheduling skill with TPM integration and predictive maintenance support
Scanned 9/2/2026
Install to Claude Code
npx -y skills add a5c-ai/babysitter --skill maintenance-scheduler --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Maintenance Scheduler?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/a5c-ai-maintenance-scheduler-babysitter)More formats (shields.io, HTML) on the badges page.
---
name: maintenance-scheduler
description: Maintenance planning and scheduling skill with TPM integration and predictive maintenance support
allowed-tools:
- Read
- Write
- Glob
- Grep
- Edit
metadata:
specialization: operations
domain: business
category: workflow-automation
graph:
domains: [domain:operations]
skillAreas: [skill-area:capacity-planning-ops, skill-area:statistical-analysis, skill-area:change-management-ops]
workflows: [workflow:vendor-onboarding, workflow:vendor-evaluation]
roles: [role:operations-analyst, role:procurement-manager, role:business-analyst]
---
# Maintenance Scheduler
## Overview
The Maintenance Scheduler skill provides comprehensive capabilities for planning and scheduling maintenance activities. It supports preventive maintenance scheduling, autonomous maintenance checklists, predictive maintenance integration, and TPM pillar support.
## Capabilities
- Preventive maintenance scheduling
- Autonomous maintenance checklists
- Predictive maintenance integration
- Spare parts planning
- Work order management
- MTBF/MTTR tracking
- Maintenance backlog management
- TPM pillar support
## Used By Processes
- LEAN-005: Standard Work Documentation
- CAP-002: Production Scheduling Optimization
- QMS-001: ISO 9001 Implementation
## Tools and Libraries
- CMMS systems (Maximo, SAP PM, Fiix)
- IoT sensors
- Predictive analytics platforms
- Mobile maintenance apps
## Usage
```yaml
skill: maintenance-scheduler
inputs:
equipment_list:
- equipment_id: "CNC-001"
name: "CNC Machine 1"
criticality: "high"
current_runtime: 4500 # hours
last_pm: "2025-12-15"
- equipment_id: "CONV-002"
name: "Conveyor System 2"
criticality: "medium"
current_runtime: 8000
last_pm: "2025-11-30"
maintenance_tasks:
- task_id: "PM-001"
description: "Lubrication"
frequency: "weekly"
duration: 30 # minutes
skills: ["mechanic"]
- task_id: "PM-002"
description: "Filter replacement"
frequency: "monthly"
duration: 60
skills: ["mechanic"]
production_schedule:
- date: "2026-01-25"
available_window: 2 # hours
technicians:
- name: "Tech A"
skills: ["mechanic", "electrical"]
availability: "day_shift"
outputs:
- maintenance_schedule
- work_orders
- parts_requirements
- resource_allocation
- backlog_report
- reliability_metrics
```
## Maintenance Types
| Type | Description | Trigger |
|------|-------------|---------|
| Reactive | Fix after failure | Breakdown |
| Preventive | Scheduled based on time/usage | Calendar/runtime |
| Predictive | Based on condition monitoring | Sensor data |
| Proactive | Eliminate failure modes | Root cause |
| Autonomous | Operator-performed | Daily/shift |
## TPM Eight Pillars
| Pillar | Focus Area |
|--------|------------|
| Autonomous Maintenance | Operator ownership |
| Planned Maintenance | Scheduled PM |
| Quality Maintenance | Zero defects |
| Focused Improvement | Eliminate losses |
| Early Equipment Management | Design for reliability |
| Training | Skills development |
| Safety/Environment | Zero accidents |
| Office TPM | Administrative efficiency |
## Reliability Metrics
### MTBF (Mean Time Between Failures)
```
MTBF = Total Operating Time / Number of Failures
Example: 1000 hours / 5 failures = 200 hours
```
### MTTR (Mean Time To Repair)
```
MTTR = Total Repair Time / Number of Repairs
Example: 25 hours / 5 repairs = 5 hours
```
### Availability
```
Availability = MTBF / (MTBF + MTTR)
Example: 200 / (200 + 5) = 97.6%
```
## Maintenance Scheduling Rules
| Priority | Criteria | Scheduling |
|----------|----------|------------|
| Critical | Safety or production stop | Immediate |
| High | Affects quality or capacity | Next available window |
| Medium | Preventive maintenance | Scheduled window |
| Low | Nice to have | When convenient |
## Predictive Maintenance Signals
| Technology | Monitors | Detects |
|------------|----------|---------|
| Vibration | Rotating equipment | Bearing wear, imbalance |
| Thermography | All equipment | Hot spots, electrical |
| Oil Analysis | Lubricated systems | Wear particles, contamination |
| Ultrasound | All equipment | Leaks, electrical arcing |
## Integration Points
- CMMS/EAM systems
- Production scheduling
- Spare parts inventory
- IoT/sensor platforms
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!