- Aspice StartSet up or change the scope of a project: role in the supply chain, inputs received, processes the team is responsible for, assessment scope, target capability level, safety and security, platform, toolchain, paths and accountable people. Writes project.yaml and nothing else. Use at the start of every project, when no project.yaml exists, or when role, scope or inputs change.Votes: 0GitHub stars: 2
- BaselineCreate baselines of approved work products, anchor them to a version control tag and record who was informed of them (Automotive SPICE SUP.8, and the communicate practices SWE.1.BP8, SWE.2.BP9, SWE.3.BP7 and SWE.4.BP7). Use for a requirements freeze, design freeze, release candidate or delivery, to write the configuration management plan, to audit a baseline, or when the trace check reports COV-26 or no approved configuration-management plan (COV-27).Votes: 0GitHub stars: 2
- Change RequestRecord, analyse, have decided, steer the implementation of, verify and close a change to items that are in a baseline (Automotive SPICE SUP.10). Use when an item inside a final baseline is to change, when a new version of an imported input arrives, when a problem report needs a change, when the write hook refuses an edit because the item is part of a baseline, or when the trace check reports COV-20 or no approved change-request-management plan (COV-27).Votes: 0GitHub stars: 2
- Component QualificationQualify a software component that was not developed for this project under ISO 26262 (part 8 clause 12): a supplied library, an operating system, a component reused from elsewhere, when it carries requirements of ASIL A to D - its specification at the version used, the qualification method and evidence, the result and its restrictions; or argue an element proven in use from its field history (part 8 clause 14). Use when the trace check reports COV-75 or COV-77, when a supplied or reused compo...Votes: 0GitHub stars: 2
- Cybersecurity ConceptTurn approved cybersecurity goals into the cybersecurity concept and carry it into development (ISO/SAE 21434 clauses 9.5, 10 and 11): cybersecurity controls and requirements derived from each goal, requirements on the operational environment, their allocation to system or software elements, security relevance carried down to design, code and tests, verification of the specifications, integration and verification with methods chosen for cybersecurity, and validation of the goals. Use when goa...Votes: 0GitHub stars: 2
- Cybersecurity PlanProject-dependent cybersecurity management of ISO/SAE 21434 (clauses 6, 7, 12 to 14): responsibilities, the cybersecurity plan with an activity and a decision per subclause in scope, tailoring with reasons, the TARA method (impact categories, feasibility approach, risk matrix), reuse, out-of-context and off-the-shelf components, the cybersecurity interface agreement with customer or supplier, the post-development plans, the cybersecurity case and the record of an independent assessment. Use w...Votes: 0GitHub stars: 2
- DocumentsGenerate the documents a customer, an assessor or a reviewer expects - specifications, architecture and design descriptions (SAD, SDD), test specifications and reports, traceability, review, release, quality, problem, change, project, risk and supplier reports, TARA report and worksheet, cybersecurity plan and case - as HTML, PDF, Word or Excel, from the items of the project, in a neutral style or in the customer's Word template, for the working state or for a baseline. Use before a delivery ...Votes: 0GitHub stars: 2
- HaraHazard analysis and risk assessment of ISO 26262 part 3 (clauses 5 and 6): the item definition, hazards from malfunctions of the item, hazardous events in operational situations classified by severity, exposure and controllability, their ASIL by the determination the safety plan states, and the safety goals with safe states and fault tolerant time intervals. Use when part 3 is under scope.safety and the HARA is to be done or redone after a change of the item, or when the trace check reports C...Votes: 0GitHub stars: 2
- Import InputsRegister delivered inputs (customer or stakeholder requirements, system requirements, system architecture and interfaces, or software-level inputs when the scope starts lower) as imported items, unchanged, one item per delivered requirement or element; write the questions to their source as query items; and prepare the input acceptance review. Use after /aspice-start, when a document was received, when a new version of an input arrives, or when a query has been answered.Votes: 0GitHub stars: 2
- Mock AssessmentRehearse an Automotive SPICE assessment of the processes in assessment scope: an evidence pack per base practice, interview questions for what the repository cannot show, a walkthrough in which named people rate each base practice N, P, L or F, a consistency check of their ratings against the observations of the trace engine and the rating dependencies of the process catalog, and a self-assessment record with strengths, weaknesses and actions. Use some weeks before an assessment, after a proc...Votes: 0GitHub stars: 2
- Next StepSay where the project stands and which skill to run next, from the state of the items, the open findings of the trace check and the evidence per base practice, in the order of the processes in scope. Recommends only; changes nothing. Use at the start of a session, after any skill has finished, or whenever it is unclear what to do next.Votes: 0GitHub stars: 2
- Problem ResolutionRecord, analyse, resolve and close problems, and analyse their trends (Automotive SPICE SUP.9): the problem resolution strategy with urgent and alert rules, problem reports with cause, impact and origin, authorised urgent actions, alert notifications, the route to a correction or a change request, closure accepted by a named person with evidence, and problem trend reports. Use when a test fails, a review finds a defect in an item that was not its subject, a customer or supplier reports a prob...Votes: 0GitHub stars: 2
- Process GateReadiness check of one process or of every process in scope: a verdict per base practice and per process (PASS, CONCERNS, FAIL, NOT ASSESSED), built from the trace engine's observations by a fixed mapping plus a semantic sample of the evidence. Use before a baseline, a release, a delivery or an assessment, or to see what a process still lacks. It is a self-check by the team, not an assessment and not a rating.Votes: 0GitHub stars: 2
- Project PlanWrite and keep the project plan (Automotive SPICE MAN.3): scope of work, life cycle and milestones, feasibility, estimation approach and resources, skills, interfaces and commitments, reporting. Use when MAN.3 is in scope and no approved plan of kind project exists (COV-27), when scope, milestones, resources or commitments change, or before the work breakdown is drafted.Votes: 0GitHub stars: 2
- Project StatusMeasure progress against the plan and report it (Automotive SPICE MAN.3.BP10, with the monitoring parts of BP4, BP5, BP7 and BP8): collect what the owners state, read the figures of `traceability.py progress`, write the project status report with the reporter's assessment, and record and follow up corrective actions. Use at every reporting date of the project plan, when a package is late or a milestone at risk, or when a corrective action is due.Votes: 0GitHub stars: 2
- Quality AssurancePrepare and record the independent quality assurance of a project (Automotive SPICE SUP.1): the quality assurance plan with its checks and escalation path, checks of work products and of process activities that build on reviews, records and the process gate, quality records with the checker's verdict, non-conformances as corrective actions or problem reports followed to closure, escalation of overdue ones, and the periodic quality report. Use at the check dates of the plan, before a baseline ...Votes: 0GitHub stars: 2
- ReleaseRelease a product from a baseline and deliver it (Automotive SPICE SPL.2, ISO 26262-2 release for production, ISO/SAE 21434 release for post-development): the release plan with content, classification, numbering, build, support and delivery; per release the checks that the baseline, the documents and the safety and cybersecurity cases are in place, the approval by a named person, the release record with its release note, and the delivery with the receipt. Use when a release is to be delivered...Votes: 0GitHub stars: 2
- ReviewPrepare and record the review of engineering items, plans, imported inputs and the code of software units: script checks, an independent semantic pass against the checklist, findings confirmed by people, and a review record written by tooling with the result of every check (SUP.1.BP2 and the consistency practices of the SYS and SWE processes). Use when items wait in draft or in-review, when the trace check reports COV-19, SUSPECT, CONSISTENCY or UPSTREAM, after code was written or changed, or...Votes: 0GitHub stars: 2
- Risk ManagementManage the risks of the project (Automotive SPICE MAN.5): the risk management plan with categories, rating scales and the acceptance threshold, risks identified throughout the project, rated and ranked, treated with owned actions, monitored with indicators, accepted by a named person, and followed by corrective action when treatment stalls. Use when MAN.5 is in scope and no approved plan of kind risk-management exists (COV-27), at each design decision, change request, problem report, supplier...Votes: 0GitHub stars: 2
- Safety AnalysisSafety analyses of ISO 26262 (part 9 clauses 6 to 8, part 6 clause 7, part 4 clause 6): FMEA, FTA, HAZOP or another method on system or software elements, dependent failures analysis for coexistence of different ASILs and for decompositions, findings with the measures that answer them, carried into requirements or design, and the verification of the analyses. Use when an element of ASIL A to D has no analysis (COV-69), when a decomposition needs its independence argued (COV-70), when findings...Votes: 0GitHub stars: 2
- Safety ConceptRefine safety goals into the safety requirements of ISO 26262 and carry their ASIL down (part 3 clause 7, part 4 clause 6, part 6 clause 6, part 9 clause 5): functional safety requirements with safe states and fault tolerance, technical safety requirements with safety mechanisms, software safety requirements, their allocation, ASIL inheritance, ASIL decomposition as a design decision resting on a dependent failures analysis, and validation of the goals. Use when safety goals are approved and ...Votes: 0GitHub stars: 2
- Safety PlanProject-dependent functional safety management of ISO 26262 (part 2 clause 6, part 8 clause 11): safety roles, impact analysis of what is new, changed or reused, the safety plan with a decision per clause in scope and tailoring with reasons, the methods applied per table of parts 4, 5, 6 and 8, the ASIL and tool confidence determinations as the project applies them, confirmation reviews, audit and assessment with their independence, tool evaluation and qualification, and the safety case. Use ...Votes: 0GitHub stars: 2
- Supplier MonitoringAgree with a supplier how the two sides work together and follow what the supplier delivers (Automotive SPICE ACQ.4): the supplier agreement with joint processes, interfaces, responsibilities, the information to exchange and the rhythm of technical and progress meetings; record of what was exchanged; supplier reviews with minutes and open items followed to closure; corrective action when agreed objectives are missed. Use when a supplier delivers software or system elements to the project, whe...Votes: 0GitHub stars: 2
- Sw ArchitectureDesign the software architecture from approved software requirements (Automotive SPICE SWE.2): components, interfaces, dynamic and resource views, design decisions, and the allocation of every requirement. Use when an architecture is to be created, extended or reworked, or when the trace check reports requirements without allocation (COV-07), components without requirements (COV-08) or missing architecture views (COV-25).Votes: 0GitHub stars: 2
- Sw Detailed DesignDevelop the detailed design of software components from an approved software architecture: one component design per developed component and its software units with function contracts, data, behaviour and trace links (Automotive SPICE SWE.3, BP1 to BP7). Use when a developed component has no detailed design, when a design is to be extended or reworked, or when the trace check reports COV-09 or COV-21.Votes: 0GitHub stars: 2
- Sw Integration TestIntegrate the software step by step and test it against the software architecture (Automotive SPICE SWE.5): integration strategy with its steps and regression rules, integration test cases derived from interfaces, components and views, test code and doubles, a build record per step, test runs on those builds, and the traceability between them. Use when components are to be integrated or integrated again after a change, or when the trace check reports COV-13, COV-17, COV-18, COV-35, COV-36, CO...Votes: 0GitHub stars: 2
- Sw Qualification TestTest the integrated software against the software requirements (Automotive SPICE SWE.6): qualification test strategy with regression rules, test cases derived from the requirements and their verification criteria, test code or bench procedures, runs on the build of the last integration step - from the host or from a test bench's JUnit report - and the traceability between requirements, cases and results. Use when the software is to be qualified for a release or again after a change, or when t...Votes: 0GitHub stars: 2
- Sw RequirementsDerive, write and analyse software requirements from system requirements and system architecture (Automotive SPICE SWE.1). Use when software requirements are to be created, extended or reworked, or when the trace check reports system requirements not covered by software requirements.Votes: 0GitHub stars: 2
- Sw Unit ImplementWrite the C99 code of software units from their approved unit design, exactly as designed, for AUTOSAR Classic targets (Automotive SPICE SWE.3.BP8). Use when an approved software unit is reported as designed but not implemented, when the trace check reports COV-10 or COV-22 for a unit, or when a defect in the code or an approved design change has to be carried into the code.Votes: 0GitHub stars: 2
- Sw Unit VerifyVerify software units against their detailed design (Automotive SPICE SWE.4): unit verification strategy, unit test cases derived from the design, test code, static verification, structural coverage, and run records written from tool output. Use when units are to be verified or re-verified after a change, or when the trace check reports COV-12, COV-17, COV-18, COV-28, COV-29, COV-30 or no approved unit-verification plan (COV-27).Votes: 0GitHub stars: 2
- Sys ArchitectureDesign the system architecture from approved system requirements (Automotive SPICE SYS.3): system elements (hardware, software, mechanical, external), system interfaces, system-level views, design decisions with alternatives, and the allocation of every system requirement. Use when a system architecture is to be created, extended or reworked, or when the trace check reports system requirements without allocation (COV-03) or system elements without requirements (COV-04).Votes: 0GitHub stars: 2
- Sys Integration TestIntegrate the system step by step and test it against the system architecture (Automotive SPICE SYS.4): system integration strategy with its steps and regression rules, integration test cases derived from system interfaces, elements and views, a build record per step, test runs on those builds from the bench's reports, and the traceability between them. Use when system elements are to be integrated or integrated again after a change, or when the trace check reports COV-15, COV-17, COV-18, COV...Votes: 0GitHub stars: 2
- Sys Qualification TestTest the integrated system against the system requirements (Automotive SPICE SYS.5): system qualification test strategy with regression rules, test cases derived from the system requirements and their verification criteria, bench or vehicle procedures, runs on the system build of the last integration step recorded from the bench's report, and the traceability between requirements, cases and results. Use when the system is to be qualified for a release or again after a change, or when the trac...Votes: 0GitHub stars: 2
- Sys RequirementsDerive, write and analyse system requirements from stakeholder requirements (Automotive SPICE SYS.2). Use when system requirements are to be created, extended or reworked, or when the trace check reports stakeholder requirements not covered by system requirements (COV-01).Votes: 0GitHub stars: 2
- TaraThreat analysis and risk assessment of ISO/SAE 21434 for the item (clauses 9.3, 9.4 and 15): the item definition, assets with their cybersecurity properties, damage scenarios rated per impact category, threat scenarios with attack paths and feasibility, risk values from the risk matrix of the cybersecurity plan, the treatment decision for each risk, and the cybersecurity goals and claims that follow. Use when clause 9 or 15 is under scope.cybersecurity and the TARA is to be done, extended or ...Votes: 0GitHub stars: 2
- Trace CheckRun the trace engine and explain what it reports: findings grouped by rule, what each rule means in plain words, which base practice it matters for, and which skill resolves it. Reads only and fixes nothing. Use when the check shows errors or warnings, before a review, a baseline or a process gate, or when someone asks what a FORMAT, SCHEMA, LINK, COV, UPSTREAM, SUSPECT, CONSISTENCY or QUERY line means.Votes: 0GitHub stars: 2
- Vulnerability ManagementContinual cybersecurity activities of ISO/SAE 21434 (clause 8): the monitoring plan with sources and triggers, collection and triage of cybersecurity information, evaluation of cybersecurity events, weaknesses recorded and analysed for exploitability, vulnerabilities rated with the risk matrix of the cybersecurity plan and treated - corrected through a change request, shared or retained in a claim, handed to incident response - and closed with evidence. Also the weaknesses found during develo...Votes: 0GitHub stars: 2
- Work BreakdownBreak the project's work into work packages and activities with owners, estimates, planned dates and dependencies, link each package to the items it delivers, and keep the breakdown consistent with the project plan and its milestones (Automotive SPICE MAN.3.BP4, BP5, BP8, BP9). Use after the project plan exists, when the trace check reports COV-31 to COV-34, when items exist that no work package delivers (COV-32), or when the plan has to be adjusted.Votes: 0GitHub stars: 2