Break the task into 2–5 independent sub-tasks, solve each in isolation with its own verification, then integrate the results and verify the system as a whole. Each sub-task boundary is an explicit contract — integration is a planned phase, not an afterthought. ---
Install via CLI
openskills install SeongwoongCho/adaptive-harness# Divide-and-Conquer Skill
Break the task into 2–5 independent sub-tasks, solve each in isolation with its own verification, then integrate the results and verify the system as a whole. Each sub-task boundary is an explicit contract — integration is a planned phase, not an afterthought.
---
## Steps
1. **Analyze — understand the full scope**
- Read all files relevant to the task: source, tests, interfaces, configuration
- Identify all modules, components, or concerns that the task touches
- Map dependencies between them — find which changes are independent and which must be sequenced
- Confirm there is no single atomic operation that would be simpler than decomposing
2. **Decompose — define 2–5 independent sub-tasks**
- Split the work into sub-tasks with minimal overlap
- For each sub-task, define: scope, inputs, outputs, and the interface contract it must satisfy
- Order sub-tasks so that dependencies are resolved before dependents
- If a sub-task touches more than 3 files, split it further
- Document the decomposition plan before proceeding
3. **Solve sub-task 1 — implement and unit-verify**
- Complete the first sub-task end-to-end
- Write or update tests that verify the sub-task contract in isolation
- Run only the tests for this sub-task — confirm green
- Do not proceed to the next sub-task if this one is failing
4. **Solve remaining sub-tasks — one at a time**
- Repeat the implement → test → confirm-green cycle for each remaining sub-task
- Keep changes strictly scoped to the current sub-task
- If a sub-task reveals that the decomposition was wrong, stop, revise the plan, and restart from step 2
5. **Integrate — combine sub-task results**
- Merge all sub-task changes into a coherent whole
- Resolve interface mismatches found at sub-task boundaries
- Update integration-level tests (or write them if none exist) that exercise sub-tasks together
- Run the full test suite — fix any failures before proceeding
6. **System verify — validate the integrated result**
- Run the full test suite including integration tests — all must pass
- Check that all sub-task contracts are satisfied end-to-end
- Verify no unintended side effects across module boundaries
- Run the build — confirm no compilation errors
7. **Final cleanup and report**
- Grep all modified files for debug artifacts — remove any found
- Confirm the decomposition plan was executed as defined
- Report: sub-tasks completed, any decomposition changes made mid-execution, and integration issues encountered