Mandatory planning workflow for ALL GitHub issues — plan, review, approve, then implement.
Scanned 9/9/2026
Install to Claude Code
npx -y skills add vamseeachanta/workspace-hub --skill issue-planning-mode --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Issue Planning Mode?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/vamseeachanta-issue-planning-mode-workspace-hub)More formats (shields.io, HTML) on the badges page.
---
name: issue-planning-mode
description: Mandatory planning workflow for ALL GitHub issues — plan, review, approve, then implement.
version: 3.1.0
author: Workspace Hub
category: coordination
tags: [planning, github, enforcement, workflow, onboarding]
related_skills:
- engineering-issue-workflow
---
# Issue Planning Mode — Mandatory for ALL Issues
**ALL agents** (Claude, Codex, Gemini, Hermes) MUST follow this workflow for every GitHub issue.
Load this skill before drafting or executing any plan.
Full onboarding guide with step-by-step details: `docs/plans/README.md`
## Workflow Overview
```
Issue → Resource Intel → Draft Plan → Adversarial Review → Post to GH
→ Label status:plan-review → USER APPROVES → Label status:plan-approved
→ Implement (TDD) → Cross-review → Completeness gate (#2798) → Close
```
> **Completeness gate before close (#2798):** compute a test-/evidence-based completeness score (`scripts/workflow/completeness_score.py`), persist it (kanban `--metadata` + issue-body ```completeness {json}``` stamp), render `docs/reports/<date>-<issue>-completeness.html`, and require the owner-only `status:completeness-verified` label (≥ class threshold) before `gh issue close`. The server-side gate (`.github/workflows/completeness-gate.yml`) reopens issues closed without it. See the rule `.claude/rules/completeness-before-close.md`.
Canonical execution method: non-trivial work must be classified up front as `single-lane`, `parallel-readonly`, or `parallel-worktree` per `docs/standards/PARALLEL_FIRST_EXECUTION.md`. Resource intelligence, plan review, and validation may run in parallel; implementation still requires user approval and TDD before any write-capable lane starts.
## Steps
### Step 1: Intake and Resource Intelligence
1. Read the full issue body — scope, acceptance criteria, references
2. Classify complexity: T1 (trivial), T2 (standard), T3 (complex)
3. Search existing code, standards, documents, and prior plans before writing. Universal Resource-Intel source (ALL issues): the drive-file index — run the drive-file-search skill or `scripts/data/drive-index-search/search.py "<terms>" --json --caller plan-resource-intel`, cite hits under "Documents consulted" (de-id per `docs/guides/drive-file-search-playbook.md`), or state "no relevant drive files"
4. Classify execution mode for the next stage: `single-lane`, `parallel-readonly`, or `parallel-worktree`. For planning, default to `parallel-readonly` evidence gathering when the issue is broad enough to benefit; the main orchestrator still owns the canonical plan.
### Step 1.5: Reproduce the alleged failure (verify-against-repo-state)
**Mandatory before drafting** when the issue alleges any of: a failing test, a broken import, a missing method, an incorrect numeric output, a regression, or a "this used to work" claim. Capture the output verbatim and cite it in the plan's `Reproduction Evidence` section.
```bash
# Test failures: run the specific failing case, not the suite
uv run pytest <repo>/tests/path/to/test_module.py::TestClass::test_case -xvs 2>&1 | tail -40
# Import / module breakage: try the import directly
cd <repo> && uv run python -c "from <module.path> import <name>; print(<name>)"
# Missing method / attribute: instantiate and call
cd <repo> && uv run python -c "from <module> import Cls; Cls().<method>()"
# Numeric / output regression: run the calc and compare against issue's claimed value
cd <repo> && uv run python -m <module>.<entrypoint> <args>
```
**Rationale (empirical RED data, 2026-05-06 session):** of 6 plans drafted from issue-body + grep alone, 4 (67%) diverged from reality. Concrete drift cases:
- `digitalmodel#559` — issue described `>` → `>=` as a one-character fix. The fixture was genuinely not diagonally dominant for rotational rows 3/4; `>=` only shifts the failure site, doesn't eliminate it.
- `worldenergydata#278` — issue alleged 4 broken `__init__.py` files in `modules/*`. Reality: 3 of 4 were healthy; the actual breakage was an absolute-path symlink in a different file the issue never named.
- `worldenergydata#270` — already fixed in a commit weeks before the plan was drafted; reproduction would have caught this in 30 seconds.
**Required output in the plan:** under `Resource Intelligence Summary > Evidence`, a `Reproduction proofs` sub-block citing the exact command, timestamp, and tail of output. The reproduction is the load-bearing artifact — without it, the plan is a guess about what the issue body claims, not a fix for what is actually broken.
**Skip-allowed only when:** issue is documentation-only, governance-only (e.g., index updates, README typos), or otherwise has no runtime claim to verify. Mark `Reproduction proofs: N/A — <reason>` so reviewers know the skip was intentional, not forgotten.
**Reviewers must reject** any plan whose `Resource Intelligence Summary` describes a runtime failure but has no reproduction citation. This is a MAJOR finding by default.
### Step 2: Draft Plan
Copy template and fill all sections:
```
docs/plans/_template-issue-plan.md --> docs/plans/YYYY-MM-DD-issue-NNN-slug.md
```
Required sections: Resource Intelligence Summary, Artifact Map, Deliverable, Pseudocode (T2/T3), Files to Change, TDD Test List, Acceptance Criteria, Risks.
**Required header fields** (per [`.claude/rules/wiki-sibling-routing.md`](../../rules/wiki-sibling-routing.md) Layer 3, [#2778](https://github.com/vamseeachanta/workspace-hub/issues/2778)):
- `Client:` — required for any plan touching wiki content (`llm-wiki` or `llm-wiki-<client>` repos). Use `N/A` for plans that don't touch wiki content (most operational, infra, or pure-workspace-hub work).
- `Project:` — optional. Populate when the plan scopes to a single project under a client (e.g., `Project: proj-a` for B1528 proj-a work under client `mkt-a`). Consumed by `check-wiki-sibling-frontmatter.py` Rule E to validate `project:` frontmatter on staged content.
- `Lane:` — required. Set the plan-time AI provider lane (`lane:codex` for heavy compute — engineering calcs, long-running analysis, large data crunching, bulk sweeps; `lane:claude` for orchestration, review, planning, light edits) per the "Compute lane assignment" rule in `.claude/memory/agents.md`, and verify the issue carries exactly one matching `lane:` label ([#3029](https://github.com/vamseeachanta/workspace-hub/issues/3029)). If planning changed the scope class, relabel the issue. Note: a human/dispatch-set `ai:` label outranks lane in routing — if one is present and now wrong, reconcile it explicitly.
When `Client:` is a real client slug (not `N/A`), verify it matches a `short_name` in [`config/client-wikis.yml`](../../../config/client-wikis.yml). When `Project:` is set, verify it's enumerated in that client's `projects:` list (or the list is absent/empty — warn-only forward-compat). <!-- scanner-allow:path_traversal_deep scanner-allow:path_traversal — relative markdown doc-link to repo config, not a runtime path -->
For engineering-calculation or parametric chart plans, also run the checks in `references/engineering-parametric-chart-plan-review.md`: freeze local vs reported coordinate frames before formulas, explicitly classify off-grid UI defaults versus engineering sweep rows, ensure representative chart traces do not hide requested sweep coverage, and require tests for frame transforms/sign conventions.
When review finds unresolved domain decisions, use `references/domain-decision-blocked-plan-review.md` to keep the plan blocked-draft/needs-decision, post a concise decision checklist, and avoid prematurely applying approval-ready labels.
For repo/data location contract plans, also run the checks in `references/repo-location-contract-planning.md`: keep repo checkout placement separate from raw/bulk/private/public data placement, prefer adjacent sibling checkouts under `/mnt/local-analysis/<repo>` with `workspace-hub` as the control plane, enumerate the live checkout set empirically, and represent any moves as future reviewable transactions rather than performing them during planning.
For per-machine repo placement plans, also apply `references/per-machine-repo-placement-outcome-contract.md`: the first machine issue in a sequence must leave a reusable pattern for consistent tier-1 repo folder structure, primary/reference checkout decisions, and repo harness/file ecosystem handling through one repo-tracked authority rather than creating machine-specific duplicate conventions.
For plans being revised after a source/provenance ambiguity is resolved, especially when licensed or private off-repo material is involved, apply `references/source-provenance-plan-revision.md`: patch the canonical plan narrowly, state the source/license boundary, add fail-closed citation/leakage tests, run focused re-review, and stop at user approval rather than self-approving.
Update the index table in `docs/plans/README.md` with a new row.
### Layered architecture issue trees
When a user asks for a feature/issue that spans multiple architectural layers (for example data at rest, execution/compute, and report/publication surfaces), prefer a parent issue plus dispatchable child issues/plans instead of one overloaded plan.
Required shape:
- Parent plan owns the cross-layer lifecycle contract, terminology crosswalk, promotion gates, and dependency boundaries.
- Child layer plans stay independently dispatchable only if they consume the parent crosswalk and do not redefine upstream/downstream interfaces.
- Use neutral layer prefixes/codes in public docs when source classes may include private/client data; avoid raw private paths and client-identifiable mappings in tracked public artifacts.
- Keep ambiguous data/report destinations fail-closed until source class, output residency, legal/source status, and promotion decision are explicitly recorded.
- For plan-review hardening, cite revision-stamped, non-empty review artifacts; do not rely on paths that can be truncated or overwritten by the same review run.
Session-specific examples and checklists: `references/layered-architecture-issue-planning.md`.
For GitHub issue portfolios that must flow from data layer → execution layer → result/output layer, use `references/data-execution-results-kanban.md`: inventory issues by architectural lane, create a repo-tracked Kanban/report artifact, delegate read-only planning/review waves by provider strengths, verify delegate claims in the orchestrator checkout, and stop at an explicit approval checkpoint before implementation.
For sequential issue-tree planning where downstream plans depend on revised upstream architecture/boundary plans, use `references/focused-reqa-before-downstream-planning.md`: run focused re-QA against the exact revised local upstream artifacts before drafting downstream issues, post concise GitHub comments for MAJOR results with `--body-file`, keep labels conservative, and block downstream drafting until upstream MAJOR findings are patched or explicitly waived.
Execution discipline for delegated agents:
- If using Claude/Codex/Gemini in parallel worktrees, explicitly anchor the repo/worktree path in the prompt/context and verify the plan file was written in the intended checkout. Do not assume the child agent stayed in the requested worktree.
- After drafting, verify all expected artifacts exist where intended:
- the plan file path
- the `docs/plans/README.md` index row
- no accidental extra rows/issues were inserted
- Keep status conservative as `draft` unless formal review artifacts actually exist under `scripts/review/results/`. GitHub comments alone are useful evidence, but they do not replace the repo’s review-artifact convention.
### Step 3: Adversarial Review
Route the plan to 2+ AI providers for review. Each gives: APPROVE | MINOR | MAJOR.
If any MAJOR: revise and re-review.
When MAJOR findings identify unresolved user/domain decisions rather than pure plan-writing defects, do **not** force the plan into `status:plan-review` or present it as approval-ready. Patch the plan/header/index to a conservative blocked-draft or needs-decision state, add a short GitHub checkpoint comment listing the exact decisions required, and keep implementation stopped. Only after the user supplies the decisions should you revise the plan, rerun adversarial review, and then surface it for approval.
For batch review closeout where a preserved task list says to move labels but fresh reviews return MAJOR, follow `references/batch-major-review-closeout.md`: post blocking summaries, keep labels conservative, update todos to reflect that `status:plan-review` is intentionally withheld, and patch only issue-scoped README rows to avoid collateral drift.
Post artifacts to `scripts/review/results/YYYY-MM-DD-plan-NNN-<agent>.md`.
**Reviewer-stance contract (mandatory framing for every review prompt):**
Every prompt sent to a reviewer MUST force an adversarial stance. "Adversarial" here means actively hunting for defects, not charitable reading. Required clauses in the prompt:
1. State explicitly: "You are an adversarial reviewer. Assume the plan has defects until proven otherwise."
2. Forbid praise and restatement: "Do not praise. Do not restate the plan. Focus only on what is wrong, missing, or risky."
3. Bias toward non-approval: "Return APPROVE only after affirmatively verifying each correctness-critical claim. When in doubt, return MINOR or MAJOR."
4. Require evidence: "Each finding must cite a specific file path, plan section, or quoted claim."
5. Treat cited sources as assertions to verify, not facts to trust.
6. Empty reviews are failures — if nothing is found, explicitly list what was checked.
7. **Prefer attested evidence over plan text (#2405).** If the review prompt carries a `## Attested Evidence` block produced by `scripts/review/attest-plan-claims.sh`, treat plan-asserted facts (issue states, file existence, commit SHAs) as **claims to verify against the attestation**, not as facts. Do not report "unverified claims" findings for facts already covered by the attestation block — they are verified by construction at the recorded commit SHA. If the plan contradicts the attestation, the contradiction is a finding; the attestation is authoritative. Cross-review dispatchers (`submit-to-codex.sh`, `submit-to-gemini.sh`) inject this block automatically for plan files under `docs/plans/`.
A review that returns APPROVE without at least one verified check-list item is suspect and should be rerun with a stronger prompt.
Rationale: user feedback 2026-04-17 on #2323 — "Make all the reviews adversarial in nature. Helps maximize productivity." Rubber-stamp reviews produce downstream rework that is more expensive than a cold review would be.
### Step 4: Post and Label
1. Commit and push the current plan plus the final no-MAJOR review artifacts. Verify the reviewed local commit equals the remote head before label changes:
```bash
git rev-parse HEAD
git ls-remote origin refs/heads/main | awk '{print $1}'
```
2. Post the plan as a GitHub issue comment, or post a label-time evidence comment that records:
- reviewed commit SHA
- plan path
- review artifact paths, including the final no-MAJOR round
- final provider verdicts
- confirmation that implementation remains blocked pending user approval
- the issue carries exactly one `lane:` label consistent with the plan's `Lane:` header field (#3029)
3. Only after the evidence comment exists, move the issue to review state:
```bash
gh issue edit NNN --remove-label "status:needs-plan" --add-label "status:plan-review"
```
Adjust the removed lower-status label if the issue uses a different earlier gate label.
4. **STOP** — do NOT implement. Wait for user approval.
Operational pitfall: do not update `docs/plans/README.md` to `plan-review` and stop there. The live GitHub label must also be reconciled, but only after pushed artifact evidence exists.
### Step 6: User Approval
The user (never the implementing agent) approves the plan:
- `gh issue edit NNN --remove-label "status:plan-review" --add-label "status:plan-approved"`
- Creates marker: `.planning/plan-approved/NNN.md`
### Step 5: User Approval
The **user** (not the implementing agent) approves:
```bash
gh issue edit NNN --remove-label "status:plan-review" --add-label "status:plan-approved"
mkdir -p .planning/plan-approved
echo "Approved by: <user>" > .planning/plan-approved/NNN.md
```
Self-approval by the implementing agent is blocked by the plan-approval gate.
### Status authority and surfacing rule
When plan status signals disagree across artifacts, use this precedence:
1. Latest/most-advanced GitHub `status:*` label is authoritative for live issue state
2. `.planning/plan-approved/NNN.md` marker is authoritative local evidence that approval happened
3. `docs/plans/README.md` is a convenience index and may lag; update it when you notice drift, but do not let it override GitHub + approval-marker reality
Practical rules:
- If both `status:plan-review` and `status:plan-approved` appear, treat `status:plan-approved` as authoritative and clean up the stale lower-status label when possible.
- Do **not** surface a plan to the user for approval until adversarial plan review is complete and the plan is actually approval-ready.
- If a GitHub issue is already at a more advanced latest status (for example `status:plan-approved`), do not downgrade it just to match a stale local plan file or README row.
### Status precedence and stale-state handling
When issue state drifts across artifacts, use this precedence order for operational decisions:
1. `status:plan-approved` label on the GitHub issue
2. `.planning/plan-approved/NNN.md` local approval marker
3. `status:plan-review` label on the GitHub issue
4. local plan status in `docs/plans/README.md`
Rules:
- Treat the **latest / most-advanced status** as authoritative. Example: if both `status:plan-review` and `status:plan-approved` are present, treat the issue as `plan-approved` until labels are cleaned up.
- `docs/plans/README.md` can lag reality; do not rely on it alone for approval state.
- A plan should be surfaced to the user for approval only after adversarial review is complete and the plan content is actually approval-ready. Do not surface draft plans just because a stale label suggests `plan-review`.
- If you find label drift or README drift, clean it up or annotate it immediately so the queue stays trustworthy.
Important operational rule learned in live use:
- If multiple `status:*` labels are present on the same GitHub issue, treat the **latest / most-advanced status** as authoritative (for example, `status:plan-approved` outranks `status:plan-review`). Clean up stale lower-status labels when possible, but do not block execution-state interpretation on label drift alone.
- Only surface a plan to the user for approval **after adversarial plan review is complete**. Draft plans with pending review findings should not be presented as approval-ready just because a local plan file exists.
- `docs/plans/README.md` can drift from GitHub labels and `.planning/plan-approved/*.md`; when auditing readiness, reconcile all three and use the latest effective state rather than trusting the README row blindly.
### Status precedence and surfacing rules
- If a GitHub issue has multiple `status:*` labels, treat the **latest/most-advanced** state as authoritative. In practice: `status:plan-approved` outranks `status:plan-review`.
- When local plan indexes (for example `docs/plans/README.md`) disagree with newer approval markers or newer GitHub status labels, reconcile to the newer/more-advanced state before deciding whether user approval is still needed.
- Use `.planning/plan-approved/<issue>.md` as the canonical local proof that approval happened.
- Do **not** surface a plan to the user for approval until adversarial plan review is complete and the plan is actually approval-ready. Draft plans with pending/failed review should be revised first, then surfaced.
### Pending cross-review audit routine
When the user asks which plans are still pending cross-provider review, audit all five signals before answering:
1. `docs/plans/README.md` plan row/status
2. direct `docs/plans/` file search for `issue-<NNN>-*.md` (catches orphaned/unindexed local plans)
3. live GitHub issue labels/state via `gh issue view/list`
4. local approval marker `.planning/plan-approved/<issue>.md`
5. review artifacts under `scripts/review/results/`
Operational rules:
- `status:plan-review` label alone is **not** sufficient to say a plan is truly pending; verify whether the issue already advanced to `status:plan-approved` or already has a local approval marker.
- `status:plan-approved` without `.planning/plan-approved/<issue>.md` is approval-state drift; flag it as governance cleanup, not a clean approval-ready item.
- README rows can be stale in either direction. Treat them as discovery/index hints, not final authority.
- Also ignore/example-filter template rows or placeholder examples in `docs/plans/README.md` (for example the sample `1234` entry in the "Entry Format" section). Do not treat README sample rows as real pending work; always verify against a live GitHub issue and an actual plan file before classifying an item.
- For cross-provider plan review, explicitly check whether provider-specific artifacts exist for Codex and Gemini (or documented substitutes when a provider was unavailable). Files like `*-subagent.md`, `*-hermes.md`, or `*-final.md` do not by themselves prove Codex/Gemini review happened.
- Also verify that a canonical local plan file actually exists under `docs/plans/`. An open issue in `status:plan-review` with no plan file and no review artifacts is **not** a true pending cross-provider review item; it is earlier-stage governance drift / missing-plan work.
- Separate the queue into:
- true pending review items (open, not approved, plan file exists, cross-review incomplete)
- needs-revision items (review artifact set exists, but latest provider findings still return MAJOR / not approval-ready)
- missing-plan items (live `status:plan-review` but no canonical `docs/plans/` artifact exists yet)
- state-drift items (labels/README/markers disagree)
- closed-stale-index items (issue already CLOSED or otherwise completed, but `docs/plans/README.md` and/or the local plan header still claim `plan-review` / `adversarial-reviewed`)
- Closed-stale-index remediation rule:
1. verify the live GitHub issue is actually CLOSED (or otherwise definitively completed)
2. verify any implementation/closeout evidence in issue comments or landed commits if needed
3. update `docs/plans/README.md` from `plan-review`/`adversarial-reviewed` to `completed`
4. update the local plan header status to `completed`
5. do not treat partial historical review artifacts as pending cross-provider work once the issue itself is already complete
- In practice, audit in this order for each candidate issue: GitHub labels/state → local plan file under `docs/plans/` → local approval marker → review artifacts by provider. This prevents wasting time chasing “missing provider reviews” for items that are actually missing the plan itself.
- Missing-plan remediation sequence (important):
1. Draft the canonical local plan under `docs/plans/` and add the `docs/plans/README.md` row with local status `draft`.
2. Post a short governance comment on the issue explaining that the item was mislabeled as `status:plan-review` without a canonical plan artifact.
3. If the issue truly had no local plan and no provider review artifacts yet, remove the stale live `status:plan-review` label while the plan is still only a local draft.
4. Run the real adversarial review wave (Claude/Codex/Gemini as available).
5. Only after provider artifacts exist, update the plan + README to `plan-review` and restore/apply the live `status:plan-review` label.
- This keeps live issue state aligned with actual plan maturity and avoids pretending a draft-only item is already in cross-provider review.
- When only the Claude review artifact is missing, a concise file-path-based `claude -p` review prompt is often more reliable than embedding the full plan text inline. If a long inline Claude review prompt hangs or hits a turn cap, retry immediately with a shorter prompt that names the plan file path and explicitly requests the required review headings.
- For plan-review items that are being iteratively tightened after MAJOR findings, keep the `## Adversarial Review Summary` current after each wave: record the latest provider verdicts, explicitly say whether the plan is still not approval-ready, and summarize what changed in the latest patch wave. Do not leave the summary stuck at `PENDING` once real artifacts exist.
2. add/update the `docs/plans/README.md` row with local status `draft`
3. post a short governance comment explaining the issue was in missing-plan drift
4. if you need labels to reflect reality strictly, remove stale `status:plan-review` until real provider review artifacts exist
5. run the provider review wave
6. once review artifacts exist, update local status to `plan-review`, restore/add the live `status:plan-review` label, and post the review-state update
- When only the Claude review artifact is missing, a concise file-path-based `claude -p` review prompt is often more reliable than embedding the full plan text inline. If a long inline Claude review prompt hangs or hits a turn cap, retry immediately with a shorter prompt that names the plan file path and explicitly requests the required review headings.
- For new or recovered plan drafts, keep the local plan file status conservative as `draft` until actual provider artifacts exist. After the first real review wave lands, update the plan file/README row to `plan-review` and summarize the live blocker state in `## Adversarial Review Summary` rather than leaving placeholder `PENDING` language.
- If you launch a long-running background Claude review and then recover with a shorter fallback prompt, do not assume the first run is dead forever. Poll or inspect the original background process/log later. If it eventually completes with a fuller or sharper review, refresh the canonical repo artifact with the stronger findings and post a short GitHub follow-up comment noting that the completed long-form review supersedes or sharpens the earlier summary.
- Practical artifact rule: the repo artifact under `scripts/review/results/` should represent the best available current-review content, not merely the first usable fallback. Late-arriving stronger findings should replace the weaker stopgap artifact rather than being ignored in terminal/process logs.
This prevents falsely telling the user there are no pending plan reviews just because the live `status:plan-review` label set is empty, and it avoids misclassifying missing-plan issues as pending provider-review work.
Additional triage rule learned in live queue audits:
- For feature/intake sweeps, do not describe an issue as "pending other-provider cross-review" unless a local plan artifact already exists and at least one real provider review artifact exists. If the issue only has the live `status:plan-review` label but lacks both the local plan file and `scripts/review/results/` artifacts, classify it as earlier-stage governance drift / missing-plan work, not as a pending cross-review item.
This prevents falsely telling the user there are no pending plan reviews just because the live `status:plan-review` label set is empty, and also prevents overstating unlived/missing-plan items as if they were already in the provider review stage.
### Governance cleanup after fresh MAJOR re-review
If a plan had previously advanced to `status:plan-approved` or gained a local approval marker, and a later fresh adversarial re-review returns blocking `MAJOR` findings, treat that as **state rollback required**, not just a note in comments.
Cleanup sequence:
1. Post the new review summary/comment linking the fresh review artifacts.
2. If the GitHub issue is still open and labeled `status:plan-approved`, remove `status:plan-approved` and add `status:plan-review`.
3. If the issue has a stale local approval marker `.planning/plan-approved/<issue>.md` but the live issue is now back in `status:plan-review`, remove the stale marker.
4. Update `docs/plans/README.md` to match the rolled-back live state (`plan-review` rather than `plan-approved`).
5. Leave a governance-cleanup comment on the issue explaining that the rollback is due to fresh blocking review evidence, not arbitrary relabeling.
Practical rules:
- For **open** issues, stale approval markers should be removed once the issue is rolled back to `status:plan-review`.
- For **closed** issues, stale `status:plan-approved` labels are misleading and should be removed, but marker cleanup can be treated as historical hygiene rather than an operational blocker.
- If a provider is unavailable (for example Gemini 429 capacity exhaustion), do not stall indefinitely; record the provider failure explicitly and continue with available review evidence while keeping the issue in a non-approved state until blocking findings are resolved.
- Fresh MAJOR review evidence outranks older optimistic comments, stale README rows, and stale marker files.
### Fresh-review rollback rule (critical drift cleanup)
If a plan receives fresh external review artifacts (for example Codex/Gemini) with `MAJOR` / `not approval-ready` after the issue had already drifted to `status:plan-approved`, treat that as a governance-state regression that must be cleaned up immediately.
Required cleanup sequence:
1. Post a short GitHub comment summarizing that fresh review evidence returned `MAJOR` and link the new review artifacts.
2. Move the issue label back from `status:plan-approved` to `status:plan-review`.
3. If a local approval marker exists at `.planning/plan-approved/NNN.md`, remove it so local state no longer implies approval.
4. Update the corresponding `docs/plans/README.md` row from `plan-approved` to `plan-review`.
5. Re-verify all three signals after cleanup:
- GitHub labels
- local approval marker presence/absence
- README row status
Operational rule:
- Fresh blocking review evidence outranks stale prior approval signals. Do not leave an issue in `status:plan-approved` just because it was previously approved if the newest adversarial review says it is not approval-ready.
- Closed issues with stale `status:plan-approved` but no matching local approval evidence should at minimum have the misleading label removed, even if you do not reopen the issue.
### Step 6: Implement (TDD)
When fresh external plan reviews land (especially Codex + Gemini) and they materially disagree with the current issue state, reconcile the workflow state immediately instead of leaving the queue misleading.
Required checks after a review wave:
1. live GitHub `status:*` labels
2. `.planning/plan-approved/<issue>.md` local marker
3. `docs/plans/README.md` row status
4. latest provider verdicts in `scripts/review/results/`
Remediation rules:
- If any fresh provider review returns `MAJOR`, do **not** leave the issue surfaced as effectively approval-ready. For open issues, roll the issue back to `status:plan-review` unless there is newer authoritative user approval after the reviewed plan revision.
- If an open issue is `status:plan-review` but still has a local `.planning/plan-approved/<issue>.md` marker from an older state, remove the stale marker so local state no longer implies approval.
- If an open issue is `status:plan-approved` but has no local approval marker, remove or downgrade the stale approval label unless there is other authoritative approval evidence you can point to.
- Sync `docs/plans/README.md` to the effective live state once labels/markers are corrected.
- Post a short GitHub comment when you perform governance cleanup so future readers know why approval-state signals changed.
Practical sequencing:
1. finish/post review artifacts
2. classify issues into approval-ready vs needs-revision
3. fix GitHub labels/comments
4. fix local marker drift
5. update `docs/plans/README.md`
6. verify the final open queue
This keeps the plan queue operationally trustworthy after large review waves instead of letting stale `plan-approved` signals linger.
### Governance cleanup when fresh review evidence contradicts current status
If a plan already carries `status:plan-approved` but fresh Codex/Gemini review returns `MAJOR` or otherwise says "not ready for user approval":
1. Treat the fresh review evidence as a governance problem, not as permission to continue.
2. Reconcile all four surfaces:
- GitHub `status:*` labels
- `.planning/plan-approved/<issue>.md` marker
- `docs/plans/README.md` row status
- `scripts/review/results/` artifacts
3. If the issue is still open and there is no local approval marker, remove stale `status:plan-approved` and move it back to `status:plan-review`.
4. If the issue is closed but still carries stale `status:plan-approved` without a marker, remove the stale approval label and post a cleanup note; do not silently leave misleading approval state behind.
5. Post a short GitHub comment explaining the cleanup and linking the blocking review artifacts.
6. Update `docs/plans/README.md` if it still claims `adversarial-reviewed` or `plan-approved` in a way that no longer matches the effective live state.
Practical rule:
- After fresh external review, the queue should distinguish between:
- pending review
- needs revision after MAJOR review
- state drift cleaned / still needs rewrite
### Step 6: Implement (TDD)
Only after `status:plan-approved` label AND `.planning/plan-approved/NNN.md` marker exist:
1. Re-check execution mode: `single-lane` for tight/shared work, `parallel-worktree` for approved disjoint write surfaces, or `parallel-readonly` for verification-only lanes.
2. Tests FIRST — write tests, confirm they fail
3. Implement minimum code to pass tests
4. Run full test suite — confirm no regressions
5. Self-review against approved plan
6. If using `parallel-worktree`, orchestrator verifies worker outputs directly and serializes commit/push/closeout.
### Step 7: Close
- Commit with conventional message referencing the issue
- Push, post summary comment, close issue
## Batch / Overnight Sessions
- Draft plans and label `status:plan-review` — do NOT implement
- Only implement issues already labeled `status:plan-approved`
## Engineering-Critical Issues
Issues with `cat:engineering*` or `cat:data-pipeline` labels require the full
`engineering-issue-workflow` skill (adds cross-review after implementation).
## Enforcement
- **PreToolUse hook**: `.claude/hooks/plan-approval-gate.sh` blocks writes without approval marker
- **Pre-commit hook**: `scripts/enforcement/require-plan-approval.sh --strict` blocks commits without approval
- **Self-approval check**: gate verifies approval was not created in the same session
### Safe paths (no approval needed)
`.planning/`, `docs/plans/`, `docs/governance/`, `docs/reports/`, `docs/standards/`,
and the four top-level agent adapter markdown files
### Emergency bypass
```bash
SKIP_PLAN_APPROVAL_GATE=1 # for Claude Code hook
FORCE_PLAN_GATE=1 git commit # for pre-commit hook
```
All bypasses are logged.
## References
- Full guide: `docs/plans/README.md`
- Template: `docs/plans/_template-issue-plan.md`
- Hard-stop policy: `docs/standards/HARD-STOP-POLICY.md`
- Engineering workflow: `.claude/skills/coordination/engineering-issue-workflow/SKILL.md`