Use when the user asks to update the todos, resync the task list, or say what to do next, or the plan and the tree have drifted apart. Not for deepening coarse lists — use todos-enhance; not for adding requirements — use todo-add.
Scanned 9/2/2026
Install to Claude Code
npx -y skills add OutlineDriven/odin-claude-plugin --skill todos-update --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Todos Update?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/outlinedriven-todos-update)More formats (shields.io, HTML) on the badges page.
---
name: todos-update
description: 'Use when the user asks to update the todos, resync the task list, or say what to do next, or the plan and the tree have drifted apart. Not for deepening coarse lists — use todos-enhance; not for adding requirements — use todo-add.'
---
# Update todos
## Contract
| Field | Bound contract |
|---|---|
| Trigger | User says 'update the todos', asks to resync the task list or what to do next, or the plan and the tree have drifted apart. |
| Authority | Reversible local write: edits the task list through the todo tool only; no implementation, no file mutation outside the todo state. |
| Side effect | Edits the task list or todo state; performs no implementation. |
| Done | The delta report lists Completed, Still open, Overtaken, Blocked, and New; every completion carries proof and the stale count is zero. |
## Inputs
- Current task list (required).
- Codebase state via file reads and test/command output (required for proof).
- Conversation context establishing design decisions (optional; used to detect overtaken items).
## Refusals
- Will not mark an item complete without proof — test output, command result, or `path:line` evidence.
- Will not fabricate a list state if the todo tool fails.
- Will not drop an overtaken item silently — every drop carries a one-line reason.
- Will not pretend the done predicate holds when the codebase state cannot be fully determined.
## Procedure
1. Read the current task list. **Done when:** the current list is loaded.
2. Inspect the codebase: read changed files, run targeted tests or commands, check `path:line` references to determine what actually landed. **Done when:** the codebase state is determined for every item.
3. Read conversation context for design changes that may have overtaken items. **Done when:** overtaken-item candidates are identified.
4. For each existing item, classify exactly once: `landed` (done, with proof), `still-open` (unchanged, still required), `overtaken` (a design change made it unnecessary), `blocked` (cannot proceed until something external clears), `newly-discovered` (not on the list; found during the work). **Done when:** every item is classified.
5. A `landed` claim requires proof: the test, the command output, or the `path:line` that demonstrates it. An unproven completion stays `still-open`. Someone saying an item is done is not proof; it is the claim under test. **Done when:** every `landed` item cites its proof.
6. Write the reconciled list back through the `todo` tool. **Done when:** the reconciled list is written.
7. An `overtaken` item is dropped with a one-line reason recorded in the report, never deleted silently. A dropped item with no recorded reason is indistinguishable from a forgotten item. **Done when:** every dropped item has a recorded reason.
8. Name exactly one next action: the first `still-open` item whose blockers are all clear, stated as a concrete action rather than a heading. When two items tie, the tiebreak is which one unblocks more of the remaining list. When every remaining item is `blocked`, name the blocker that has to clear first — one answer, not a list. **Done when:** exactly one next action or one blocker is named.
9. Emit the delta only: what changed classification, and why. **Done when:** the delta report is emitted.
## Failure and recovery
| Failure class | Behavior |
|---|---|
| Missing proof | An item claimed complete but lacking test output, command result, or `path:line` evidence stays `still-open`. Record the proof gap in the report. |
| Todo tool failure | Do not fabricate a list state. Report the error; the list remains unchanged. |
| Non-convergent delta | If the codebase state cannot be fully determined, return a partial result with explicit gaps rather than pretending the done predicate holds. |
## Output
Delta report: each item whose classification changed, its new class, and the reason — every `landed` item cites its proof, exactly one next action is named or one blocker is named as the reason none is, and zero stale items remain.