Review whether an approved QStack HTML plan was faithfully executed by comparing plan.html with execution.md, executor.md, or legacy implementation notes and the actual committed and uncommitted code changes. Build a requirement-to-evidence matrix, identify missing or unapproved deviations, check whether the execution record matches reality, and assign a guarded 0-5 adherence score. Use when invoked as /qstack-plan-adherence-review, when asked whether a plan was followed, or before closing or...
Scanned 9/5/2026
Install to Claude Code
npx -y skills add hani-q/qstack --skill qstack-plan-adherence-review --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Qstack Plan Adherence Review?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/hani-q-qstack-plan-adherence-review)More formats (shields.io, HTML) on the badges page.
---
name: qstack-plan-adherence-review
description: >
Review whether an approved QStack HTML plan was faithfully executed by
comparing plan.html with execution.md, executor.md, or legacy implementation
notes and the actual committed and uncommitted code changes. Build a
requirement-to-evidence matrix, identify missing or unapproved deviations,
check whether the execution record matches reality, and assign a guarded
0-5 adherence score. Use when invoked as /qstack-plan-adherence-review, when
asked whether a plan was followed, or before closing or landing planned work.
---
# /qstack-plan-adherence-review
Audit the implementation against the plan. Treat the plan as the contract, the
code and test results as ground truth, and the execution record as supporting
evidence that must itself be checked.
This is report-only work. Do not edit the plan, execution record, code, tests,
or repository instructions. Do not commit or push. Write an
`adherence-review.md` only when the user explicitly asks for a saved artifact;
otherwise report in the final response.
## Resolve the evidence
1. Use a plan path supplied by the user.
2. Otherwise use a plan clearly referenced in the conversation.
3. Otherwise inspect `qstack/compound_engineering/plans/*/plan.html`, then
legacy `compound-engineering/plans/*/plan.html` and `plan.md`. Never select
`.template/`. Use the only plausible candidate; ask when multiple candidates
remain.
4. In the plan directory, prefer `execution.md`. Also read `executor.md` and
legacy `implementation-notes.md` when present; do not discard history merely
because a newer filename exists.
5. Read `board-events.js` beside them when it exists. Run `node --check`, then
skip its required format header and fold the remaining
`qstackBoardEvent({...});` calls in file order for each card's final status,
owner, `refs`, and `files`. Stop on broken JavaScript. Agents write
the board while they work, so it has the standing `execution.md` already has
here: evidence to be checked against the code, never trusted on its own.
When only the retired `board.jsonl` exists, fold its raw JSON lines without
editing it. If both board files exist, report the conflict and trust neither.
Read repository instruction files and the whole authoritative plan. Record the
plan status. A draft or proposed plan may be reviewed, but state that it lacked
implementation authority.
Determine the implementation range before judging it. Prefer, in order:
1. a base ref, reviewed fingerprint, or commit range explicitly recorded in the
execution record;
2. a base supplied by the user;
3. the merge base with the repository's target branch, normally `origin/main`;
4. a range reconstructed from plan history and relevant commits.
Inspect committed changes, working-tree changes, and relevant untracked files.
State the chosen base and inclusions. Exclude unrelated changes only with a
concrete reason; list exclusions so hidden scope cannot improve the score.
## Extract the plan contract
Turn the plan into individually testable obligations. Include:
- user-visible outcomes and acceptance criteria;
- locked decisions, interfaces, data shapes, and architectural constraints;
- required build and migration steps;
- validation and release gates;
- explicit non-goals when the implementation crosses them.
Do not turn background, rationale, rejected options, examples, or tentative
ideas into requirements. Keep the plan's section or clause identifier on every
obligation. Split compound requirements when their parts can succeed or fail
independently.
## Trace each obligation to reality
For every obligation, inspect the implementation and assign exactly one status:
- **Met**: direct code or test evidence satisfies it.
- **Approved deviation**: the implementation differs materially, and the
record contains concrete evidence that the user approved the change.
- **Partial**: some required behavior exists, but a material part is absent or
unproven.
- **Missing**: no implementation evidence exists.
- **Unapproved deviation**: reality materially differs without evidenced
approval.
- **Not verifiable**: available evidence cannot establish the result.
An execution-record claim is not implementation evidence. Verify paths,
symbols, behavior, migrations, generated artifacts, and tests against the
current tree. When safe and proportionate, rerun focused validation rather than
repeating a recorded success. Distinguish a missing test from a failing test
and from a test that was not run.
With a board present, every card whose `refs` cite an obligation's clause is
part of that obligation's evidence trail. Read `Review mode` from
`execution.md`: exactly one `full` value says a `done` card passed per-card
review, while exactly one `final` or `none` value deliberately omits that
review. In every mode, `done` says only that the loop closed the card, not that
the obligation holds, so verify the code exactly as above. When a legacy record
has no `Review mode`, state that and treat it as the loops' former implicit
`full` mode without penalizing the missing field; still verify its recorded
reviews and board transitions. A duplicated, malformed, or unknown value is
invalid execution evidence, not a legacy record. Flag it explicitly. Two board
findings carry more weight than any card status:
- an obligation no card cites, which means the breakdown missed a requirement
and nothing was ever scheduled to satisfy it;
- a card at `done` whose `files` show no corresponding change in the tree,
which is the strongest single finding a board can produce.
Check the execution record and the board separately for:
- completed boxes whose implementation is missing;
- changes or decisions absent from the record;
- deviations mislabeled as ordinary implementation detail;
- approval claims with no recorded decision;
- stale validation results or fingerprints;
- a `complete` status that does not satisfy the plan's completion gate;
- in `full` mode, cards at `done` with no per-card review recorded, excluding
the gate card of the `review` epic, which carries the plan-level review
instead of a per-card one;
- in `full` or `final` mode, a missing or stale final review fingerprint;
- in `none` mode, a missing explicit record that review was skipped;
- a selected mode weaker than the minimum review required by the plan or
repository instructions;
- board transitions or review evidence that contradict the recorded review
mode;
- cards left at `claimed` or `in-progress` while the record calls the work
complete;
- `blocked` cards whose question in `note` was never put to the user;
- `split` parents whose children were never created.
## Score adherence
Assign one overall score. Use the lowest description that fits the material
evidence; do not average away a serious miss.
| Score | Meaning | Required evidence |
| --- | --- | --- |
| **5: Faithful** | The approved plan was fully executed. | Every material obligation is met or covered by an evidenced approved deviation; validation passes; the execution record is accurate; no blocker remains. |
| **4: Substantially faithful** | The intended result is complete, with only minor gaps. | All critical and user-visible obligations are met; remaining issues are non-material documentation, test, or record-quality gaps. |
| **3: Partially faithful** | The core result exists, but execution departed materially. | At least one material obligation is partial, unverified, or changed without evidenced approval, while the central outcome still works. |
| **2: Weak adherence** | Important parts of the contract were not delivered. | Multiple material obligations are missing or contradicted, or a release/acceptance gate fails. |
| **1: Nominal adherence** | Only isolated pieces resemble the plan. | The central behavior or design is absent despite some related changes. |
| **0: Not executed** | There is no credible implementation of the plan. | No relevant change exists, or the implementation directly abandons the plan's central outcome. |
Apply these score caps:
- Cap at **3** for any material unapproved deviation.
- Cap at **2** for a missing or failing blocker involving security, privacy,
data correctness, migration safety, or a required release gate.
- Cap at **4** when any material obligation is not verifiable or the execution
record materially misstates reality.
- Cap at **4** when the board and the execution record disagree about what was
completed, because one of the two records is wrong and the review cannot tell
which.
- Do not penalize an approved deviation merely for differing from the frozen
plan; judge whether the approved replacement was actually implemented.
Counts support the score but do not determine it. Report totals for each
status, then explain which material evidence set the score and which caps were
applied.
## Report
Lead with the verdict and score. Then provide:
1. **Evidence reviewed**: plan, execution records, base/range, working-tree
state, and validation run.
2. **Findings**: ordered by severity, with plan clause, code or test evidence,
impact, and concrete remedy. State explicitly when there are no findings.
3. **Traceability matrix**: one row per obligation: clause, concise promise,
status, implementation evidence, execution-record evidence, and the cards
citing that clause with their final status.
4. **Record accuracy**: contradictions and omissions in the execution record.
5. **Score rationale**: status counts, material failures, and any score caps.
6. **Next actions**: the smallest steps needed to reach a 5.
Use repository-relative `file:line` citations and commit identifiers. Never
claim a behavior from filenames or comments alone. Separate verified facts from
inference and say plainly when the evidence is insufficient.