Risk Officer

ASecurity

Use when surfacing and prioritising risk before commit — blast-radius framing, mitigations, residual-risk verdict — even if the user just says 'what could go wrong here?'.

  • 10 stars
  • 0 votes
  • 0 copies
  • 2 views
  • Added June 5, 2026
ai-agentsgosecurity

Security analysis

A100/100

Scanned June 5, 2026

npx -y skills add event4u-app/agent-config --skill risk-officer --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Risk Officer?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Risk Officer
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/event4u-app-risk-officer/badge)](https://www.skillsdirectory.com/skills/event4u-app-risk-officer)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
model_tier: high
name: risk-officer
description: "Use when surfacing and prioritising risk before commit — blast-radius framing, mitigations, residual-risk verdict — even if the user just says 'what could go wrong here?'."
personas:
  - critical-challenger
  - senior-engineer
domain: quality
workspaces:
  - engineering
packs:
  - engineering-base
---

# risk-officer

> Surface risks the implementer or PO is likely to underweight, score
> them by **likelihood × impact**, and propose mitigations the team
> can actually execute. Sibling of
> [`threat-modeling`](../threat-modeling/SKILL.md) (security-only)
> and [`blast-radius-analyzer`](../blast-radius-analyzer/SKILL.md)
> (call-site only) — this skill takes the wider product, ops, and
> coordination view.

## When to use

- Pre-implementation: a roadmap, ADR, or refined ticket needs a risk
  pass before the team commits.
- Pre-merge: a non-trivial diff is about to land and the team wants
  one more risk lens beyond the four standard judges.
- Post-incident: surface the risks the team should track to prevent
  recurrence (without writing the post-mortem itself).
- German triggers: "was kann schiefgehen?", "Risiko-Check", "wo
  brennt es?".

Do NOT use when:

- The concern is exclusively security or authZ — route to
  [`threat-modeling`](../threat-modeling/SKILL.md) or
  [`judge-security-auditor`](../judge-security-auditor/SKILL.md).
- The concern is exclusively call-site impact of a refactor — route
  to [`blast-radius-analyzer`](../blast-radius-analyzer/SKILL.md).
- The user wants a fix, not a risk view — risk-officer never patches.

## Procedure

### 1. Inspect the change

Read the input (roadmap step, ticket, diff, post-mortem) and identify
the scope in one sentence: *"This change does X for users Y, touching
systems Z."* If you cannot, the artefact is not reviewable — stop and
ask.

### 2. Enumerate risks across five lenses

| Lens | Sample questions |
|---|---|
| Product | Wrong outcome shipped, churn, support load, brand impact |
| Operations | Rollback path, observability, on-call burden, alert noise |
| Coordination | Cross-team dependencies, communication gaps, sequencing |
| Data | Loss, corruption, leakage, retention, compliance, residency |
| Time | Schedule slip, opportunity cost, sunk-cost lock-in |

Per lens, list each risk as a single bullet. Reject vague risks —
"could break things" is not a risk; "queue worker silently drops
messages on retry exhaustion" is.

### 3. Score each risk

For every risk, assign **L** (likelihood: low / med / high) and **I**
(impact: low / med / high). Top-5 sort by `LxI` rank; cite the
trigger condition for each L and I. Do NOT pad to a fixed count —
three sharp risks beat ten generic ones.

### 4. Propose mitigations

For the top-5 risks, propose **one** mitigation that the team can
own. Each mitigation has an owner role (eng, ops, PO, support), a
rough size (S / M / L), and a residual-risk note (what stays after
mitigation). Mitigations the team cannot execute are not mitigations
— flag them as `accept` or escalate.

### 5. Issue a verdict

| Verdict  | When to issue |
|---|---|
| `proceed`             | Top-5 risks have owned mitigations; residual is acceptable |
| `proceed-with-mitigations` | Mitigations must land BEFORE or WITH the change |
| `pause`               | One or more `high × high` risks have no executable mitigation |

`pause` is not a veto — it forces the user to decide explicitly.

### 6. Validate the verdict

Before emitting, verify each top-5 risk has: a concrete trigger, a
scored L×I, an owned mitigation (or explicit `accept`), and a
residual note. Ensure the verdict matches the worst residual — a
`high × high` residual without executable mitigation must produce
`pause`, not `proceed`.

## Output format

The report is a single block with these ordered fields:

1. `Target:` — one-sentence scope from step 1
2. `Top-5 risks:` — numbered list, each with `L=`, `I=`, trigger,
   mitigation, owner, size, residual
3. `Other risks tracked:` — count of risks below the top-5 cut
4. `Verdict:` — exactly one of `proceed` / `proceed-with-mitigations`
   / `pause`

```
Risk-Officer
Target: <one-sentence scope>

Top-5 risks:
1. 🔴 <risk> (L=high, I=high)  Trigger: <condition>
   Mitigation: <action>  Owner: <role>  Size: <S/M/L>
   Residual: <what remains>
2. 🟡 <risk> (L=med, I=high)   ...

Other risks tracked: <count>, summarised below or omitted if low/low.

Verdict: proceed | proceed-with-mitigations | pause
```

## Gotcha

- A risk without a trigger is a vibe, not a risk. Reject vibes.
- Likelihood is conditional on the change — not the universal base
  rate of the system. "Postgres goes down" is not a risk of *this
  change* unless the change increases that likelihood.
- Mitigations the team will not execute are theatre. Be honest in
  the residual-risk note.

## Do NOT

- Do NOT enumerate every conceivable risk — top-5 with rationale is
  the contract.
- Do NOT score `high × high` reflexively to be cautious; mis-scoring
  destroys the rank.
- Do NOT propose mitigations the agent itself will own — the owner
  is always a human role.
- Do NOT issue `pause` as a soft veto on something the user already
  decided; issue `proceed-with-mitigations` and surface the residual.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.