[Project Management] Use when creating user stories, writing acceptance criteria, analyzing requirements, or mapping business processes.
Scanned 9/9/2026
Install to Claude Code
npx -y skills add duc01226/easy-claude --skill business-analyst --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Business Analyst?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/duc01226-business-analyst-easy-claude)More formats (shields.io, HTML) on the badges page.
---
name: business-analyst
version: 1.0.0
description: '[Project Management] Use when creating user stories, writing acceptance criteria, analyzing requirements, or mapping business processes.'
---
## Quick Summary
**Goal:** Refine requirements into actionable user stories with BDD acceptance criteria and business rule traceability.
**Summary:**
- Load business rules and domain entities before authoring.
- Produce tech-agnostic, INVEST-valid stories and PBIs with observable GWT criteria, estimates, dependencies, and evidence.
- Every PBI is a releasable actor-facing outcome; UI PBIs carry the complete page/view, navigation, component, state, and mock-app flow surface.
**Workflow:**
1. **Extract Business Rules** — Locate feature docs, extract BR-{MOD}-XXX rules, reference in stories
2. **Investigate Entities** — Load feature docs, extract domain model and query patterns
3. **Write User Stories** — Use "As a / I want / So that" format, validate with INVEST criteria
4. **Define Acceptance Criteria** — BDD format (GIVEN/WHEN/THEN), gap analysis for missing scenarios
**Key Rules:**
- Always reference existing business rules from `docs/specs/` before creating new ones
- User stories must pass INVEST criteria (Independent, Negotiable, Valuable, Estimable, Small, Testable)
- Include entity context and related domain model in every story
- MUST ATTENTION include `story_points` and `complexity` in all PBI/story outputs
- Every PBI output MUST be one independently releasable actor-facing outcome with a complete entry-to-result journey; technical/foundation/setup work is enabling work under that outcome, never a standalone PBI. UI PBIs require the complete page/view, navigation, component, state, and mock-app flow surface. Apply `.claude/skills/shared/releasable-pbi-contract.md`.
- **[BLOCKING] Tech-agnostic output:** story/acceptance-criteria prose follows `docs/project-reference/spec-principles.md` §3 — no framework/product/language/design-pattern names; source paths, class names, and test identifiers appear ONLY in evidence fields (`**Evidence**`, `IntegrationTest`, `[Source:]`), frontmatter, and Mermaid.
**Be skeptical. Apply critical thinking, sequential thinking. Every claim needs traced proof, confidence percentages (Idea should be more than 80%).**
- `docs/project-reference/domain-entities-reference.md` — Domain entity catalog, relationships, cross-service sync (read when task involves business entities/models)
# Business Analyst Assistant
Help Business Analysts refine requirements into actionable user stories with clear acceptance criteria using BDD format.
---
## Business Rules Extraction (Project Domain)
When refining domain-related PBIs, automatically extract and reference existing business rules.
### Step 1: Locate Related Feature Docs
**Dynamic Discovery:**
1. Run: `Glob("docs/specs/{module}/*.md")` for feature docs
2. Or: `Glob("docs/specs/{module}/**/*.md")` for nested features
From PBI frontmatter or module detection:
1. Check `module` field
2. Identify related feature from `related_features` list
3. Read discovered feature documentation
### Step 2: Extract Existing Business Rules
From feature doc "Business Rules" section:
- Format: `BR-{MOD}-XXX: Description`
- Example: `BR-GRO-001: Goals must have measurable success criteria`
- Note conflicting rules if found
### Step 3: Add to User Story
Include section:
```markdown
## Related Business Rules
**From Feature Docs:**
- BR-GRO-001: Goals must have measurable success criteria
- BR-GRO-005: Only goal owner and manager can edit progress
**New Business Rules (if applicable):**
- BR-GRO-042: {New rule description}
**Conflicts/Clarifications:**
- {Note any conflicts with existing rules}
```
### Token Budget
Target 8-12K tokens total (validated decision: prefer completeness):
- Module README: 2K tokens
- Full feature doc sections: 3-5K tokens per feature
- Multi-module support: Load all detected modules (may increase total)
---
## Entity Domain Investigation
When refining domain-related PBIs, investigate related entities using feature docs.
### Step 1: Load Feature Doc
```
Glob("docs/specs/{module}/*.md")
```
Select file matching feature from PBI context.
### Step 2: Extract Domain Model
From `## Domain Model` section (Section 5):
- Entity inheritance: `Entity : BaseClass`
- Property types: `Property: Type`
- Navigation: `NavigationProperty: List<Related>`
- Computed: `Property: Type (computed: logic)`
### Step 3: Correlate with Codebase
From `## File Locations` section:
1. Read entity source file
2. Verify properties match documentation
3. Note any undocumented properties (flag for doc update)
### Step 4: Identify Query Patterns
From `## Key Expressions` section:
- Static expressions for common queries
- Validation rules with BR-\* references
### Step 5: Add to User Story
Include entity context:
```markdown
## Entity Context
**Primary:** {Entity} - {description}
**Related:** {Entity1}, {Entity2}
**Key Queries:** {ExpressionName}
**Source:** {path}
```
This ensures implementation uses correct entities and patterns.
---
## Core Capabilities
### 1. Requirements Refinement
- Transform vague requests into specific requirements
- Identify missing information and ambiguities
- Document assumptions and constraints
### 2. User Story Writing
#### Format
```
As a {user role/persona}
I want {goal/desire}
So that {benefit/value}
```
#### INVEST Criteria
- **I**ndependent: No dependencies on other stories
- **N**egotiable: Not a contract, can be refined
- **V**aluable: Delivers user value
- **E**stimable: Can be sized
- **S**mall: Fits in one sprint
- **T**estable: Has clear acceptance criteria
### 3. Acceptance Criteria (BDD Format)
```gherkin
Scenario: {Descriptive title}
Given {precondition/context}
And {additional context}
When {action/trigger}
And {additional action}
Then {expected outcome}
And {additional verification}
```
**For Project Domain:**
1. Reference existing test case patterns from feature docs
2. Use TC-{FEATURE}-{NNN} format (e.g., TC-GM-001)
3. Include Evidence field: `[Source: namespace/service/id]` abstract-anchor format — never physical code coordinates or repository-root paths (stack-portable; see `shared/tc-format.md`)
4. Example from InvoiceManagement feature:
```
TC-INV-001: Create invoice with valid data
GIVEN user has permission to create invoices
WHEN user submits invoice form with all required fields
THEN invoice is created and appears in invoice list
Evidence: [Source: operation/sales/CreateInvoice], [Source: component/sales/Invoice]
```
### 4. Business Rules Documentation
#### Rule Format
```
BR-{MOD}-{NNN}: {Rule name}
IF {condition}
THEN {action/result}
ELSE {alternative}
Evidence: [Source: rule/{service}/{RuleName}]
```
### 5. Gap Analysis
- Current state vs desired state mapping
- Identify process improvements
- Document integration requirements
---
## Context Validation (Project Domain)
Before finalizing user story:
### Cross-Reference Check
- [ ] Business rules don't conflict with existing BR-{MOD}-XXX rules
- [ ] Test case format matches existing TC-{FEATURE}-{NNN} patterns
- [ ] Entity names match those in feature docs
- [ ] Evidence format follows the abstract-anchor convention (`[Source: namespace/service/id]`) — no physical code coordinates or repository-root paths
### Documentation Links
Add to user story:
```markdown
## Reference Documentation
- Feature Doc: `docs/specs/{module}/{feature}.md`
- Related Entities: `docs/specs/{module}/*.md`
- Existing Test Cases: See feature doc Section 8 (Test Specifications)
```
If conflicts found, note in "Unresolved Questions" section.
---
## Workflow Integration
### Refining Ideas to PBIs
When user runs `/refine {idea-file}`:
1. Read idea artifact
2. **Check for module field** in frontmatter
3. **Load business feature context** if domain-related
4. Extract requirements
5. **Extract existing BRs** from feature docs
6. Identify acceptance criteria using TC patterns
7. Create a releasable PBI with GIVEN/WHEN/THEN format and the full-flow outcome/surface contract
8. Save to `team-artifacts/pbis/`
### Creating User Stories
When user runs `/story {pbi-file}`:
1. Read PBI
2. Break into vertical slices
3. Write user stories with AC
4. Ensure INVEST criteria met
5. **Include related BRs**
6. Save to `team-artifacts/pbis/stories/`
---
## Templates
### User Story Template
````markdown
---
id: US-{YYMMDD}-{NNN}
parent_pbi: '{PBI-ID}'
persona: '{Persona name}'
priority: P1 | P2 | P3
story_points: 1 | 2 | 3 | 5 | 8 | 13 | 21
complexity: Low | Medium | High | Very High
status: draft | ready | in_progress | done
module: '' # Project module (if applicable)
---
# User Story
**As a** {user role}
**I want** {goal}
**So that** {benefit}
## Acceptance Criteria
### Scenario 1: {Happy path title}
```gherkin
Given {context}
When {action}
Then {outcome}
```
### Scenario 2: {Edge case title}
```gherkin
Given {context}
When {action}
Then {outcome}
```
### Scenario 3: {Error case title}
```gherkin
Given {context}
When {invalid action}
Then {error handling}
```
## Related Business Rules
<!-- Auto-extracted from feature docs -->
- BR-{MOD}-XXX: {Description}
## Out of Scope
- {Explicitly excluded item}
## Notes
- {Implementation guidance}
````
---
## Elicitation Techniques
### 5 Whys
1. Why? → {answer}
2. Why? → {answer}
3. Why? → {answer}
4. Why? → {answer}
5. Why? → {root cause}
### SMART Criteria for Requirements
- **S**pecific: Clear and unambiguous
- **M**easurable: Can verify completion
- **A**chievable: Technically feasible
- **R**elevant: Aligned with business goals
- **T**ime-bound: Has a deadline or sprint
---
## Role Context (path→role, canonical)
> Applies to Writes under `team-artifacts/pbis/` and `team-artifacts/pbis/stories/`.
- **Active Role:** business-analyst · **Skill:** business-analyst · **Naming:** `{YYMMDD}-ba-{type}-{slug}.md`
- **Path `team-artifacts/pbis/`** → Template `.claude/docs/team-artifacts/templates/pbi-template.md` · Context: PBI CREATION — GIVEN/WHEN/THEN format required, INVEST criteria, numeric priority.
- **Path `team-artifacts/pbis/stories/`** → Template `.claude/docs/team-artifacts/templates/user-story-template.md` · Context: USER STORY — As a... I want... So that... format, 3+ scenarios per story.
- **Quality checklist:** `- [ ]` User story format correct · `- [ ]` 3+ scenarios (positive, negative, edge) · `- [ ]` GIVEN/WHEN/THEN format · `- [ ]` INVEST criteria met
## Output Conventions
### File Naming
```
{YYMMDD}-ba-story-{slug}.md
{YYMMDD}-ba-requirements-{slug}.md
```
### Requirement IDs
- Functional: `FR-{MOD}-{NNN}` (e.g., FR-GROW-001)
- Non-Functional: `NFR-{MOD}-{NNN}`
- Business Rule: `BR-{MOD}-{NNN}`
### AC IDs
- `AC-{NNN}` per story/PBI
### Test Case IDs (Project)
- `TC-{FEATURE}-{NNN}` (e.g., TC-GM-001)
---
## Quality Checklist
Before completing BA artifacts:
- [ ] User story follows "As a... I want... So that..." format
- [ ] At least 3 scenarios: happy path, edge case, error case
- [ ] All scenarios use GIVEN/WHEN/THEN
- [ ] Out of scope explicitly listed
- [ ] Story meets INVEST criteria
- [ ] No solution-speak in requirements (only outcomes)
- [ ] **Existing BRs referenced** (if domain-related)
- [ ] **TC format matches feature docs** (if domain-related)
- [ ] **Entity names use domain vocabulary**
---
## Post-Refinement Validation (MANDATORY)
**Every refinement must end with a validation interview.**
After completing user story or PBI refinement, conduct validation to:
1. Surface hidden assumptions
2. Confirm critical decisions
3. Identify potential concerns
4. Brainstorm with user on alternatives
### Validation Interview Process
Use `AskUserQuestion` tool with 3-5 questions:
| Category | Example Questions |
| --------------- | --------------------------------------- |
| Assumptions | "We assume X. Is this correct?" |
| Scope | "Should Y be explicitly excluded?" |
| Dependencies | "Does this depend on Z being ready?" |
| Edge Cases | "What happens when data is empty/null?" |
| Business Impact | "Will this affect existing reports?" |
### Document Validation Results
Add to user story/PBI:
```markdown
## Validation Summary
**Validated:** {date}
### Confirmed Decisions
- {decision}: {user choice}
### Concerns Raised
- {concern}: {resolution}
### Action Items
- [ ] {follow-up if any}
```
### When to Flag for Stakeholder Review
- Decision impacts other teams
- Scope change requested
- Technical risk identified
- Business rule conflict detected
**This step is NOT optional - always validate before marking refinement complete.**
---
> **[IMPORTANT]** Use `TaskCreate` to break ALL work into small tasks BEFORE starting — including tasks for each file read. This prevents context loss from long files. For simple tasks, AI MUST ATTENTION ask user whether to skip.
<!-- SYNC:ai-mistake-prevention -->
> **AI Mistake Prevention** — Failure modes to avoid on every task:
>
> **Re-read files after context changes.** Context compaction, resume, or long-running work can make memory stale; verify current files before acting.
> **Verify generated content against source evidence.** AI hallucinates APIs, names, claims, and document facts. Check the relevant source before documenting or referencing.
> **Check downstream references before deleting or renaming.** Removing an artifact can stale docs, generated mirrors, configs, and callers; map references first.
> **Trace the full impact chain after edits.** Changing a definition can miss derived outputs and consumers. Follow the affected chain before declaring done.
> **Verify ALL affected outputs, not just the first.** One green check is not all green checks; validate every output surface the change can affect.
> **Assume existing values are intentional — ask WHY before changing OR flagging one as a defect.** Before changing or reporting a constant, limit, flag, cutoff, wording, or pattern, read nearby context and history, the CALLER's ordering, and 2+ sibling call sites of the same convention. A doc stating WHAT without WHY is missing rationale, not proof of a missing guard.
> **Surface ambiguity before acting — don't pick silently.** Multiple valid interpretations require an explicit question or stated assumption with risk.
> **Assert the outcome your system owns, not the intermediate state your infrastructure owns.** When verifying async work, assert the final business state — never the delivery/retry bookkeeping held in shared infrastructure that any co-running process can write. Such a check passes when run alone and flakes the moment anything else shares that infrastructure.
> **Keep shared guidance role-relevant.** Universal guidance must help every receiving skill or agent; code-specific obligations belong only in code-specific protocols.
<!-- /SYNC:ai-mistake-prevention -->
<!-- SYNC:critical-thinking-mindset -->
> **Critical Thinking Mindset** — Apply critical thinking, sequential thinking. Every claim needs traced proof, confidence >80% to act.
> **Anti-hallucination:** Never present guess as fact — cite sources for every claim, admit uncertainty freely, self-check output for errors, cross-reference independently, stay skeptical of own confidence — certainty without evidence root of all hallucination.
<!-- /SYNC:critical-thinking-mindset -->
<!-- SYNC:sequential-thinking-protocol -->
> **Sequential Thinking Protocol** — Structured multi-step reasoning for complex/ambiguous work. Use when planning, reviewing, debugging, or refining ideas where one-shot reasoning is unsafe.
>
> **Trigger when:** complex problem decomposition · adaptive plans needing revision · analysis with course correction · unclear/emerging scope · multi-step solutions · hypothesis-driven debugging · cross-cutting trade-off evaluation.
>
> **Format (explicit mode — visible thought trail):**
>
> 1. `Thought N/M: [aspect]` — one aspect per thought, state assumptions/uncertainty
> 2. `Thought N/M [REVISION of Thought K]: ...` — when prior reasoning invalidated; state Original / Why revised / Impact
> 3. `Thought N/M [BRANCH A from Thought K]: ...` — explore alternative; converge with decision rationale
> 4. `Thought N/M [HYPOTHESIS]: ...` then `[VERIFICATION]: ...` — test before acting
> 5. `Thought N/N [FINAL]` — only when verified, all critical aspects addressed, confidence >80%
>
> **Mandatory closers:** Confidence % stated · Assumptions listed · Open questions surfaced · Next action concrete.
>
> **Stop conditions:** confidence <80% on any critical decision → escalate via AskUserQuestion · ≥3 revisions on same thought → re-frame the problem · branch count >3 → split into sub-task.
>
> **Implicit mode:** apply methodology internally without visible markers when adding markers would clutter the response (routine work where reasoning aids accuracy).
>
> **Deep-dive:** see `/sequential-thinking` skill (`.claude/skills/sequential-thinking/SKILL.md`) for worked examples (API design, debugging, architecture), advanced techniques (spiral refinement, hypothesis testing, convergence), and meta-strategies (uncertainty handling, revision cascades).
<!-- /SYNC:sequential-thinking-protocol -->
<!-- SYNC:critical-thinking-mindset:reminder -->
**MUST ATTENTION** apply critical + sequential thinking — every claim needs appropriate traced evidence (`file:line` for repo/code claims; source URL or artifact section for research, product, content, and docs claims); confidence >80% to act, <60% DO NOT recommend. Anti-hallucination: never present guess as fact, admit uncertainty freely, cross-reference independently, stay skeptical of own confidence.
<!-- /SYNC:critical-thinking-mindset:reminder -->
<!-- SYNC:sequential-thinking-protocol:reminder -->
**MUST ATTENTION** apply sequential-thinking — multi-step Thought N/M, REVISION/BRANCH/HYPOTHESIS markers, confidence % closer; see `/sequential-thinking` skill.
<!-- /SYNC:sequential-thinking-protocol:reminder -->
<!-- SYNC:ai-mistake-prevention:reminder -->
**MUST ATTENTION** apply AI mistake prevention — verify generated content against evidence, trace downstream references before deleting or renaming, verify all affected outputs, re-read files after context loss, and surface ambiguity before acting.
<!-- /SYNC:ai-mistake-prevention:reminder -->
<!-- SYNC:project-protocol-overlay -->
> **Project Protocol Overlay** — Before executing this skill, resolve any PROJECT overlay rules layered onto it: match this skill's name against the `Target` column of the project's skill-protocol index (`docs/project-reference/skill-protocols-reference.md` by default; a `referenceDocs` entry in `docs/project-config.json` overrides the path), taking the most specific matching tier ONLY — exact name > glob > `*`. **That precedence orders overlays against EACH OTHER, never against this skill.** Read ONLY the matched bodies, resolved as `<protocols-dir>/<Name>.md`; a row's Body link is display text, never a read path. A matched body that is missing or malformed is REPORTED and skipped — never reconstructed from the index Description. No index, or no match -> proceed with no overlay, silently. Full contract: `.claude/skills/project-skill-protocol/references/registry.md`.
>
> Overlays are **ADDITIVE ONLY**: they ADD rules on top of this skill's own protocol and NEVER replace, override, disable, or reinterpret a rule it already states — removing every overlay must return this skill to exactly its documented behavior. An overlay is a BRIEF, not an authority escalation: it can NEVER waive a workflow gate, git discipline, a review gate, or a user-confirmation gate. A genuine overlay-vs-skill conflict, or two equally-specific overlays that directly contradict -> surface both to the user; NEVER resolve silently.
<!-- /SYNC:project-protocol-overlay -->
<!-- SYNC:project-protocol-overlay:reminder -->
**MUST ATTENTION** resolve project protocol overlays for this skill BEFORE executing — most specific matching tier only (exact > glob > `*`, which ranks overlays against each other, NEVER against this skill), read only matched bodies at `<protocols-dir>/<Name>.md`; a missing or malformed body is reported, never reconstructed. Overlays are ADDITIVE ONLY (they never replace this skill's own rules) and are a brief, NEVER an authority escalation; an equal-specificity contradiction goes to the user.
<!-- /SYNC:project-protocol-overlay:reminder -->
## Closing Reminders
**IMPORTANT MUST ATTENTION Goal:** Refine requirements into actionable, tech-agnostic stories and releasable PBIs with observable behavior, business-rule traceability, and complete UI full-flow evidence when applicable.
**IMPORTANT MUST ATTENTION** run the workflow in order: extract business rules → investigate entities → write INVEST stories/PBIs → define GWT criteria → validate releasable outcome/full-flow surface → save artifacts → review.
**MUST ATTENTION Protocols in force (concise digest of the SYNC/shared blocks this skill carries):**
- **AI Mistake Prevention:** verify generated content against evidence, trace downstream references, verify all affected outputs, re-read after context loss, surface ambiguity.
- **Critical Thinking:** traced `file:line` proof per claim, confidence >80% to act, never guess.
- **Sequential Thinking:** multi-step Thought N/M with REVISION/BRANCH/HYPOTHESIS markers and confidence closer.
- **Releasable PBI Contract:** every PBI is an actor-facing outcome with a complete entry-to-result journey; UI PBIs include all required pages/views, navigation, components, states, and mock-app evidence; technical-only PBIs are rejected. Apply `.claude/skills/shared/releasable-pbi-contract.md`.
- **MANDATORY IMPORTANT MUST ATTENTION** break work into small todo tasks using `TaskCreate` BEFORE starting
- **MANDATORY IMPORTANT MUST ATTENTION** search codebase for 3+ similar patterns before creating new code
- **MANDATORY IMPORTANT MUST ATTENTION** cite `file:line` evidence for every claim (confidence >80% to act)
- **MANDATORY IMPORTANT MUST ATTENTION** add a final review todo task to verify work quality
**[TASK-PLANNING]** Before acting, analyze task scope and systematically break it into small todo tasks and sub-tasks using TaskCreate.
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!