Construction business development knowledge — proposal summarization, quotations with cost categories, industry terminology, Atlassian workflows.
Scanned 9/20/2026
Install to Claude Code
npx -y skills add darellchua2/opencode-config-template --skill construction-bd-skill --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Construction Bd Skill?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/darellchua2-construction-bd-skill)More formats (shields.io, HTML) on the badges page.
---
name: construction-bd-skill
description: >-
Construction business development knowledge — proposal summarization,
quotations with cost categories, industry terminology, Atlassian workflows.
license: Apache-2.0
compatibility: opencode
category: Startup/Business
---
# Construction Business Development Skill
## Proposal Summarization Workflow
When summarizing construction proposals, extract and organize information by the following categories:
1. **Project Overview and Objectives**
- Project type (commercial, residential, industrial, infrastructure)
- Primary goals and success criteria
- Scope of work boundaries
- Client expectations and deliverables
2. **Technical Specifications and Requirements**
- Architectural and engineering specifications
- Building codes and compliance requirements
- Quality standards and certifications (LEED, OSHA, etc.)
- Technical constraints and site conditions
3. **Material and Resource Needs**
- Primary materials (concrete, steel, lumber, fixtures, etc.)
- Equipment requirements (cranes, excavators, specialized tools)
- Labor classifications (skilled, unskilled, supervision)
- Subcontractor needs (electrical, plumbing, HVAC, MEP)
4. **Timeline and Milestones**
- Project phases and sequencing
- Critical path and dependencies
- Mobilization and demobilization schedules
- Delivery deadlines and milestone dates
5. **Stakeholders and Responsibilities**
- Client representatives
- Project managers and superintendents
- Subcontractors and vendors
- Regulatory bodies and permitting authorities
6. **Risk Factors and Mitigation Strategies**
- Site-specific risks (weather, access, soil conditions)
- Supply chain considerations
- Regulatory and permitting risks
- Safety and compliance concerns
## Quotation Preparation Workflow
### Cost Category Breakdown
When preparing construction quotations, organize costs into these standard categories:
1. **Materials**
- Raw materials (concrete, steel, lumber, aggregates)
- Finished products (windows, doors, fixtures)
- Specialized components (MEP systems, FF&E)
- Quantity takeoffs and unit pricing
2. **Labor**
- Skilled trades (carpenters, electricians, plumbers, welders)
- Unskilled labor
- Supervision (foremen, superintendents, project managers)
- Man-hour estimates by trade
3. **Equipment**
- Rental costs (cranes, excavators, scaffolding)
- Purchase costs for permanent equipment
- Fuel and maintenance
- Mobilization and demobilization fees
4. **Subcontractors**
- Electrical work
- Plumbing and mechanical
- HVAC systems
- Specialized trades (fire protection, elevators)
5. **Permits and Inspections**
- Building permits
- Environmental assessments
- Inspection fees
- Plan review costs
6. **Insurance and Bonding**
- General liability insurance
- Workers' compensation
- Performance bonds
- Bid bonds
7. **Overhead**
- Office operations
- Administrative support
- Utilities and facilities
- Project management software
8. **Markup and Profit**
- Standard markup (typically 15-25%)
- Contingency (typically 10-20%)
- Profit margin calculations
- Per Diem rates for travel
### Pricing Standards
- Use current market rates obtained via web search
- Research regional pricing variations
- Consider prevailing wage requirements
- Include appropriate unit price or lump sum structures
- Apply mobilization/demobilization costs separately
## Construction Industry Terminology
### Procurement and Bidding Terms
- **RFI (Request for Information)**: Formal request for clarification on project specifications
- **RFP (Request for Proposal)**: Detailed solicitation for vendor proposals
- **RFQ (Request for Quotation)**: Request for pricing on specific materials or services
### Contract Management Terms
- **Change Order**: Formal modification to contract scope, price, or schedule
- **Punch List**: Final list of items requiring correction before project acceptance
- **Submittal**: Formal submission of materials, samples, or drawings for approval
- **Shop Drawings**: Detailed drawings prepared by contractors showing specific installation details
- **Value Engineering**: Systematic review to reduce costs without compromising quality
### Certification and Compliance Terms
- **LEED Certification**: Leadership in Energy and Environmental Design green building certification
- **OSHA Compliance**: Occupational Safety and Health Administration safety standards
- **Prevailing Wage**: Government-mandated wage rates for public projects
### Construction Methods Terms
- **Crane Lift Plans**: Detailed engineering plans for heavy lifting operations
- **Shoring/Underpinning**: Temporary support structures for excavation or foundation work
- **MEP (Mechanical, Electrical, Plumbing)**: Building systems integration
- **HVAC (Heating, Ventilation, Air Conditioning)**: Climate control systems
- **FF&E (Furniture, Fixtures, Equipment)**: Non-permanent building components
### Delivery Methods Terms
- **Turnkey Delivery**: Contractor handles all aspects from design to completion
- **Design-Bid-Build**: Traditional sequential delivery method
- **Design-Build**: Integrated design and construction approach
- **CM at Risk (Construction Manager at Risk)**: Construction manager with guaranteed maximum price
- **GMP (Guaranteed Maximum Price)**: Fixed price contract with shared savings potential
### Pricing Structure Terms
- **Unit Price**: Price based on quantity of work (e.g., per linear foot)
- **Lump Sum**: Fixed price for entire scope of work
- **Mobilization/Demobilization**: Costs associated with bringing equipment to/from site
- **Per Diem**: Daily allowance for travel and living expenses
## Atlassian Integration Workflow
### JIRA Ticket Creation
Create JIRA tickets with the following field mapping:
1. **Basic Fields**
- Project: BD (Business Development)
- Issue Type: Task or Story
- Summary: "[Proposal/Quotation] - Client Name - Project Name"
- Description: Include comprehensive summary with:
* Document overview
* Key specifications extracted
* Cost breakdown summary
* Timeline and milestones
* Stakeholder information
- Priority: Set based on urgency and deal value
- Labels: Add relevant tags (construction, proposal, quotation, client-name)
2. **Custom Fields**
- Client Name: Text field
- Estimated Value: Currency field
- Project Type: Dropdown (commercial, residential, industrial, infrastructure)
- Due Date: Date picker
- Document Type: Dropdown (proposal, quotation, RFQ, RFP)
- Status: Dropdown (draft, submitted, under-review, awarded, lost)
3. **Attachments**
- Generated .docx files
- Generated .md files
- Original technical documents
- Supporting calculations and schedules
### Confluence Page Creation
Create Confluence pages with proper structure:
1. **Page Setup**
- Space: BD (Business Development) or client-specific space
- Title: "Client Name - Project Name - Proposal/Quotation"
- Parent Page: Organize by client or project phase
2. **Content Structure**
- Executive Summary
- Project Overview
- Technical Specifications
- Cost Breakdown Table
- Timeline and Milestones
- Stakeholder Information
- Risk Assessment
- Supporting Documents section with links
3. **Linking and Metadata**
- Link to JIRA ticket using JIRA macro
- Add appropriate labels for filtering
- Set page restrictions as needed
- Include version history for tracking changes
4. **Document Formatting**
- Use table of contents macro for navigation
- Include expand/collapse sections for detailed specifications
- Use status macros to track document state
- Add page properties macro for metadata
## Document Generation Specifications
### Word (.docx) Format Requirements
1. **Document Structure**
- Cover page with company branding
- Executive summary
- Table of contents
- Main content sections
- Appendices for technical details
- Terms and conditions
2. **Formatting Standards**
- Professional header/footer with company logo
- Consistent font styling (headings, body text)
- Proper table formatting with borders and shading
- Numbered sections and subsections
- Page numbering
3. **Content Elements**
- Professional tables for cost breakdowns
- Inserted images (plans, drawings, charts)
- Multi-level lists for specifications
- Bold emphasis for key terms and figures
- Professional terminology throughout
### Markdown (.md) Format Requirements
1. **Document Structure**
- Heading hierarchy (H1, H2, H3)
- Code blocks for technical specifications
- Tables for cost breakdowns
- List items for requirements
2. **Formatting Standards**
- Consistent heading levels
- Proper table formatting with alignment
- Links to external references
- Emphasis (bold, italic) for key points
3. **Content Elements**
- Markdown tables for itemized costs
- Code blocks for technical specifications
- Ordered lists for requirements
- Checklists for deliverables
- Links to supporting documents
## Web Search Usage for Market Rates
When researching construction pricing:
1. **Search Strategies**
- Use specific queries: "material prices [region] [year]"
- Include units: "concrete per cubic yard [city]"
- Search by trade: "electrical labor rates [state]"
- Include timeframe: "current steel prices 2026"
2. **Data Sources**
- Industry publications and databases
- Government cost indices
- Supplier price lists
- Regional contractor associations
3. **Validation Steps**
- Cross-reference multiple sources
- Verify regional applicability
- Check for recent market fluctuations
- Consider bulk vs. retail pricing
4. **Documentation**
- Note sources and dates
- Record geographic scope
- Track price trends
- Maintain pricing database
## Error Handling
### Web Search Errors
- **No pricing data found**: Document the gap and suggest manual research
- **Conflicting information**: Note discrepancies and recommend verification
- **Outdated data**: Check dates and flag for updates
- **Regional mismatch**: Specify location constraints
### JIRA Integration Errors
- **Field mapping failures**: Provide clear error messages with field names
- **Attachment size limits**: Suggest splitting documents or using cloud storage
- **Permission issues**: Recommend user authentication checks
- **API rate limits**: Suggest batching or retry with delays
- **Manual workaround**: Provide step-by-step instructions for manual ticket creation
### Confluence Integration Errors
- **Space access issues**: Verify permissions and suggest alternative spaces
- **Page title conflicts**: Recommend adding dates or unique identifiers
- **Formatting failures**: Suggest markdown-only fallback
- **Link creation errors**: Provide manual linking instructions
### Document Generation Errors
- **Word formatting issues**: Fall back to markdown-only format
- **Table rendering problems**: Use simplified table structures
- **Image insertion failures**: Provide alternative text descriptions
- **File size limits**: Compress images or split into multiple documents
### General Error Recovery
- Always preserve original technical documents
- Maintain error logs for troubleshooting
- Provide clear user-facing error messages
- Offer alternative workflows when automated steps fail
- Document manual steps as fallback procedures
- Validate data integrity before finalizing
- Maintain version control for all generated documents
## Best Practices
1. **Accuracy and Quality**
- Double-check all calculations
- Verify technical specifications against source documents
- Use current market rates and validate sources
- Maintain professional formatting and branding
2. **Consistency and Standardization**
- Use consistent terminology throughout all documents
- Follow standard construction cost categorization
- Maintain uniform document structures
- Apply consistent pricing methodologies
3. **Communication and Tracking**
- Include clear disclaimers and terms of service
- Track all documents in Atlassian systems
- Provide complete audit trails
- Maintain version history for revisions
4. **Documentation Management**
- Store all source documents for reference
- Maintain organized file naming conventions
- Keep pricing research records
- Archive completed projects appropriately
5. **Industry Compliance**
- Adhere to local building codes and regulations
- Follow safety standards (OSHA, etc.)
- Comply with prevailing wage requirements
- Include necessary permit and inspection informationIs this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!