Based on product definition and technical constraints, use systems thinking methodology to output technical feasibility analysis reports, including technology route comparison, BOM cost estimation, core risk identification, and supply chain feasibility analysis.
Scanned 9/12/2026
Install to Claude Code
npx -y skills add ahang1598/doubao-workbuddy-qwenwork-skills --skill 技术方案论证 --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of 技术方案论证?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ahang1598-doubao-workbuddy-qwenwork-skills-4c4c660c)More formats (shields.io, HTML) on the badges page.
---
name: 技术方案论证
title: 技术方案论证
description: 'Based on product definition and technical constraints, use systems thinking methodology to output technical feasibility analysis reports, including technology route comparison, BOM cost estimation, core risk identification, and supply chain feasibility analysis.'
source: community
author: QoderWork
githubUrl: https://github.com/qoderwork/skills
docsUrl: https://docs.qoder.com
category: product-development
tags:
- technical-feasibility
- bom
- systems-thinking
- risk-analysis
- supply-chain
roles:
- engineer
- founder
- product-manager
featured: false
popular: false
isOfficial: false
installCommand: |
git clone https://github.com/qoderwork/skills
cp -r 技术方案论证 ~/.qoder/skills/
date: 2026-06-07
version: 1.0.0
description_zh: '基于产品定义与技术约束,运用系统思维方法论输出技术可行性分析报告,包含技术路线对比、BOM成本估算、核心风险识别与供应链可行性分析。'
user-invocable: true
argument-hint: 输入产品定义与技术约束,如"基于AI质检PRD,整机成本<5000元"
---
<!-- START_SUITE_CONTEXT: 以下内容来自 .qoder-plugin/qoder.md,所有 Skill 共享 -->
# 科技服务助手套件使用说明
## 概述
科技服务助手是一套贯通需求侧与供给侧的全流程工具套件,覆盖技术转移、产品研发与商业化的完整闭环。本套件包含13个专业技能,分为需求侧6个技能和供给侧7个技能,支持独立调用或链路协同。
## 使用流程
### 需求侧链路(技术引进方)
按顺序调用以下技能,完成从需求识别到政策匹配的全流程:
1. **技术需求挖掘** → 识别企业技术瓶颈,输出需求画像与学科映射
2. **成果搜索与匹配** → 多源检索匹配科技成果、专利与研发团队
3. **技术价值评估** → 评估技术商业化可行性,输出定价参考
4. **对接方案生成** → 生成技术转移合作方案书,含交易结构与里程碑
5. **项目跟进管理** → 全生命周期Pipeline管理,风险预警与行动清单
6. **政策与资金匹配** → 智能匹配可申报政策、基金与补贴
### 供给侧链路(技术输出方)
按顺序调用以下技能,完成从产品机会到融资准备的全流程:
1. **产品机会发现** → 运用设计思维发现产品机会,输出痛点地图
2. **产品定义与规划** → 输出PRD文档、MVP范围与产品路线图
3. **技术方案论证** → 技术可行性分析,含路线对比、BOM估算与风险矩阵
4. **原型验证规划** → 输出EVT计划书,含测试方案与迭代策略
5. **设计验证与量产规划** → DVT/PVT检查清单、量产准备度评估
6. **商业化策略** → GTM策略文档,含定价、渠道与PMF验证指标
7. **融资准备** → BP框架、数据房清单、估值参考与投资人匹配
### 供需协同
- 需求侧输出的"技术需求描述"可供给供给侧优化产品定义
- 供给侧输出的"成果信息"与"商业化可行性"可供给需求侧完善对接方案
- 需求侧"估值区间"与供给侧"BOM成本"双向参考,形成合理定价
- **项目跟进管理**同步跟踪供需双方项目推进状态
## 输入输出规范
### 通用要求
- 所有输出须标注数据来源、查询日期及置信度
- 不确定性信息须明确说明局限性
- 技术需求描述须具体可量化,避免空泛表述
- 执行五维合规校验:政治合规、政策合规、数据合规、广告宣传合规、隐私合规
### 跨Skill数据流转
| 字段 | 流转方向 |
|------|----------|
| 需求编号 | 技术需求挖掘 → 成果搜索与匹配 |
| 成果编号 | 成果搜索与匹配 → 技术价值评估 |
| TRL | 成果搜索与匹配 ↔ 技术价值评估 ↔ 对接方案生成 |
| 匹配分 | 成果搜索与匹配 → 对接方案生成 |
| 估值区间 | 技术价值评估 → 对接方案生成 |
| 项目编号 | 全链路通用 |
| PRD版本 | 产品定义与规划 → 技术方案论证 |
| EVT编号 | 原型验证规划 → 设计验证与量产规划 |
| BOM成本 | 技术方案论证 → 商业化策略 |
| PMF验证结果 | 商业化策略 → 融资准备 |
## 外部系统连接规范
- **只读拉取公开数据**:可直接执行,须在输出中标注数据来源、查询日期与数据性质
- **涉及写入/推送/同步操作**:必须向用户展示目标系统、字段映射、权限要求、影响范围,并经用户显式确认后方可执行
- **涉及商业数据库/付费接口/私有系统**:必须经用户显式确认后方可执行
- 任何操作均不得自动执行,不得超出用户明确授权范围
- 若用户明确拒绝连接,应基于已提供信息继续完成任务,不因拒绝而中断或降级任务质量
## 免责声明
本套件协助专业工作流程,不替代专业法律、财务或技术评估意见。所有输出内容应经合格专业人士审核后用于决策。市场预测和估值仅为假设测算,不替代专业判断。
<!-- END_SUITE_CONTEXT -->
## Use Cases
- 基于PRD进行系统架构分解(L0→L1→L2)与技术路线选型
- 估算BOM成本(初算±30%/精算±15%/锁定±5%)并识别供应链风险
- 构建五维风险矩阵评估技术、成本、供应链、工艺、进度风险
- 开展DFM/DFA可制造性初步评估与关键路径分析
## Example
```bash
# 输入示例
基于AI质检产品PRD,技术约束:整机成本<5000元,开发工期6个月,论证技术可行性
```
## Use when
以下关键词或场景可触发本 Skill:
"技术可行性分析"、"系统架构设计"、"BOM成本估算"、"供应链风险评估"、"技术路线对比"、"DFM分析"、"DFA分析"、"关键路径识别"、"技术选型评估"、"可行性报告输出"
Trigger keywords: "technical feasibility analysis", "system architecture design", "BOM cost estimation", "supply chain risk assessment", "technology route comparison", "DFM analysis", "DFA analysis", "critical path identification", "technology selection evaluation", "feasibility report output"
## Not for
- 不替代专业工程师的详细设计
- BOM成本基于公开市场数据,实际价格以供应商报价为准
- 供应链风险需动态跟踪
## User must provide
- 产品定义(PRD或功能描述)
- 技术约束(成本/工期/性能上限,至少一项)
## Ask if missing
- 若缺少技术约束,询问整机成本目标、开发工期、关键性能指标
- 若产品定义不完整,询问核心功能、用户场景、验收标准
## Output
- 技术可行性分析报告(Markdown格式)
- 包含:系统架构(L0→L1→L2)、技术路线对比(关键模块≥2条)、BOM成本估算(三级)、关键路径、风险矩阵(五维)、DFM/DFA评估、供应链分析
- **核心方法论**:系统思维——架构分解(MECE)→关键路径识别→风险矩阵评估
- **系统架构**:按L0整机→L1子系统→L2模块层级分解,明确功能边界、接口定义、性能要求与技术约束
- **技术路线对比**:关键模块至少提供2条路线,对比维度含技术原理、性能上限、成熟度、BOM成本、供应链可得性、专利壁垒、扩展性
- **BOM成本**:分三级估算,需区分NRE(一次性工程费用)与单位成本;价格基于公开市场数据或供应商报价
- **关键路径**:识别长周期器件(定制芯片/模具/特种材料)、技术验证点与外部依赖,输出路径图与缓冲时间建议
- **风险矩阵**:五维覆盖——技术风险、成本风险、供应链风险、工艺风险、进度风险;按概率×影响评定风险等级并制定缓解措施
- **DFM/DFA评估**:审视零件数量、装配方向、公差要求、标准件使用率、专用工装/夹具需求
- **供应链分析**:需考虑地缘政治与贸易政策影响,核心器件建议双源采购或国产替代
- **参考文档**:
- [references/系统架构方法.md](references/系统架构方法.md) — 架构分解原则、接口定义方法、技术路线对比维度、BOM估算方法、关键路径法(CPM)
- [references/风险评估模板.md](references/风险评估模板.md) — 风险矩阵模板、DFM/DFA检查清单、供应链风险评估框架
- **五维合规校验**:
1. 政治合规:技术选型不涉及受限技术出口
2. 政策合规:符合行业技术标准与安全规范
3. 数据合规:BOM价格基于公开市场数据或供应商报价
4. 广告宣传合规:成本估算标注精度范围,不做绝对承诺
5. 隐私合规:供应链分析不涉及供应商商业秘密
- **输入兜底**:若技术约束未提供(成本/工期/性能上限缺失),基于行业基准假设进行估算,并在报告中明确标注"假设条件"与"建议补充确认项",避免用户误将假设当作承诺
- **外部系统连接(仅草案)**:区分操作类型与数据性质,差异化处理:
- **只读拉取公开数据**(如政府公开网站、国家知识产权局公开数据库、科技部/工信部公开政策接口、学术期刊开放获取数据、法院判决公开信息等):可直接执行,无需显式确认,但须在输出中标注数据来源、查询日期与数据性质(公开数据)
- **涉及写入/推送/同步操作**(如写入Notion/飞书/CRM、推送广告后台、同步项目管理工具/实验室排期系统、同步Jira等):必须向用户展示目标系统、字段映射、权限要求、影响范围,并经用户显式确认后方可执行
- **涉及商业数据库/付费接口/私有系统**(如企查查、IT桔子、Statista、Sensor Tower、立创商城API、腾讯广告API、认证机构付费接口等):必须经用户显式确认后方可执行
- 任何操作均不得自动执行,不得超出用户明确授权范围
- **拒绝执行兜底**(适用于需确认场景):若用户明确拒绝连接或表示不需要外部数据(如回复"不需要""不用了""跳过"等),skill应回应"已收到,将基于您已提供的信息继续完成分析,不连接外部系统。"并正常输出本skill核心交付物,不因用户拒绝而中断或降级整体任务质量。
- **统一确认话术模板**(适用于需确认场景):"拟执行以下外部系统操作:【操作简述,如'从XX系统拉取YY数据'/'向XX系统写入YY数据'】。目标系统:【系统名称】;涉及字段:【字段映射列表】;权限要求:【所需授权说明】;影响范围:【数据范围与风险说明】。请确认是否执行?(回复'确认'以继续,或回复'不需要'以跳过)"
- **Session内确认复用**(适用于需确认场景):在同一对话session中,若用户此前已确认连接某外部系统且操作类型(拉取/写入/推送)与字段映射未发生变更,再次涉及该系统的确认时可简化为:"是否继续使用【系统名称】执行【操作简述】?(回复'确认'继续,或'不需要'跳过)"。若操作类型、字段映射或权限要求发生变更,或进入新session,仍需按完整模板重新确认。
## 数据边界声明
- 所有引用数据须标注来源、查询日期及置信度;不确定性信息须明确说明局限性。
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!